Drill Stem Tests Database
Specific Well--15-007-22607
API: 15-007-22607
Operator: WOOLSEY PETROLEUM CORP.
Field: Medicine Lodge
Lease: Spriggs 'G'
Well 2
Location: T33S R13W, Sec. 28, SW SW SW
330 North, 330 East, from SW corner
Longitude: -98.7482457
Latitude: 37.1385606
County: Barber
Status: GAS
Spud Date: 30-NOV-99
Completion Date: 11-JAN-00
Plugging Date:
Total Depth: 4570
Form. at depth: LANSING
Elevation: 1689 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3671 to 3721
Formation tested: Elgin sand
Date, Time: 06-DEC-99; 22:53:12
Initial Hydro Pressure: 1868 PSI
First Initial Flow Pressure: 251 PSI
First Final Flow Pressure: 1085 PSI
Initial Shut-in Pressure: 1471 PSI
Second Initial Flow Pressure: 1002 PSI
Second Final Flow Pressure: 1243 PSI
Final Shut-in Pressure: 1431 PSI
Final Hydro Pressure: 1793 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3683 ft.
Initial Flow: Strong blow bottom of bucket in 15 secs. gas to surface in 1 1/2 mins Initial Shut-in: Bled down for 30 mins. built back to weak surface blow
Final Flow: Strong blow bottom of bucket in 10 secs. gauge gas
Final Shut-in: Bled down for 45 mins built back to weak surface blow
Bottom Hole Temperature: 108 DEG F
Percent Porosity:
Samples: Caraway Analytical
Gas Recovery:
Comments:
Recovery
165 of Total Fluid
165 of Fluid in Drill Pipe
3518 of Gas in pipe
55 of Gas and condensate cut mud
55 of Gas and condensate cut mud
55 of Gas and condensate cut mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3886 to 3935
Formation tested: Snyderville
Date, Time: 08-DEC-99; 10:30:49
Initial Hydro Pressure: 1935 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 52 PSI
Initial Shut-in Pressure: 1013 PSI
Second Initial Flow Pressure: 77 PSI
Second Final Flow Pressure: 81 PSI
Final Shut-in Pressure: 1011 PSI
Final Hydro Pressure: 1912 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3899 ft.
Initial Flow: Guage gas. Initial Shut-In: back.
Final Flow: Strong blow built to bottom of bucket in 10 seconds.
Final Shut-In: Bled down for 15 minutes. No blow back.
Bottom Hole Temperature: 109 DEG F
Percent Porosity:
Samples: Caraway Analytical 728 N.Roosevelt
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Pipe
90 of Very slightly gas cut mud
3809 of Gas in pipe
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.