API: 15-007-22607
Operator: WOOLSEY PETROLEUM CORP. Field: Medicine Lodge Lease: Spriggs 'G' Well 2 |
Location: T33S R13W, Sec. 28, SW SW SW
330 North, 330 East, from SW corner Longitude: -98.7482457 Latitude: 37.1385606 County: Barber Status: GAS |
Spud Date: 30-NOV-99
Completion Date: 11-JAN-00 Plugging Date: Total Depth: 4570 Form. at depth: LANSING Elevation: 1689 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3671 to 3721
Formation tested: Elgin sand | Date, Time: 06-DEC-99; 22:53:12 |
Initial Hydro Pressure: 1868 PSI
First Initial Flow Pressure: 251 PSI First Final Flow Pressure: 1085 PSI Initial Shut-in Pressure: 1471 PSI Second Initial Flow Pressure: 1002 PSI Second Final Flow Pressure: 1243 PSI Final Shut-in Pressure: 1431 PSI Final Hydro Pressure: 1793 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3683 ft. |
Initial Flow: Strong blow bottom of bucket in 15 secs. gas to surface in 1 1/2 mins Initial Shut-in: Bled down for 30 mins. built back to weak surface blow Final Flow: Strong blow bottom of bucket in 10 secs. gauge gas Final Shut-in: Bled down for 45 mins built back to weak surface blow |
|
Bottom Hole Temperature: 108 DEG F
Percent Porosity: Samples: Caraway Analytical Gas Recovery: Comments: | |
Recovery 165 of Total Fluid 165 of Fluid in Drill Pipe 3518 of Gas in pipe 55 of Gas and condensate cut mud 55 of Gas and condensate cut mud 55 of Gas and condensate cut mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 3886 to 3935
Formation tested: Snyderville | Date, Time: 08-DEC-99; 10:30:49 |
Initial Hydro Pressure: 1935 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 52 PSI Initial Shut-in Pressure: 1013 PSI Second Initial Flow Pressure: 77 PSI Second Final Flow Pressure: 81 PSI Final Shut-in Pressure: 1011 PSI Final Hydro Pressure: 1912 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3899 ft. |
Initial Flow: Guage gas. Initial Shut-In: back. Final Flow: Strong blow built to bottom of bucket in 10 seconds. Final Shut-In: Bled down for 15 minutes. No blow back. |
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: Samples: Caraway Analytical 728 N.Roosevelt Gas Recovery: Comments: | |
Recovery 90 of Total Fluid 90 of Fluid in Drill Pipe 90 of Very slightly gas cut mud 3809 of Gas in pipe | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |