API: 15-007-22609
Operator: Apollo Energies, Inc. Field: Aetna Lease: Achenbach 'A' Well 2 |
Location: T34S R13W, Sec. 30, S2 N2 NE
990 South, 1320 West, from NE corner Longitude: -98.7709696 Latitude: 37.0621491 County: Barber Status: O&G |
Spud Date: 13-DEC-99
Completion Date: 07-JAN-00 Plugging Date: Total Depth: 4900 Form. at depth: MISSISSIPPIAN Elevation: 1704 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4033 to 4060
Formation tested: Toronto | Date, Time: 18-DEC-99; 23:07:59 |
Initial Hydro Pressure: 1943 PSI
First Initial Flow Pressure: 53 PSI First Final Flow Pressure: 41 PSI Initial Shut-in Pressure: 896 PSI Second Initial Flow Pressure: 34 PSI Second Final Flow Pressure: 32 PSI Final Shut-in Pressure: 837 PSI Final Hydro Pressure: 1902 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4020 ft. |
Initial Flow: Strong blow. Bottom of bucket in 10 seconds. Gas to surface in 12 minutes Initial Shut-in: Weak blow. 1/2"". Final Flow: Strong blow. (see gas volume report) Final Shut-In: No blow. |
|
Bottom Hole Temperature: 99 DEG F
Percent Porosity: 12 Samples: Gas sample Gas Recovery: Comments: | |
Recovery 40 of Total Fluid 40 of Fluid in Drill Pipe 40 of Drilling mud 4000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4668 to 4688
Formation tested: Hertha | Date, Time: 21-DEC-99; 00:34:27 |
Initial Hydro Pressure: 2330 PSI
First Initial Flow Pressure: 15 PSI First Final Flow Pressure: 18 PSI Initial Shut-in Pressure: 197 PSI Second Initial Flow Pressure: 18 PSI Second Final Flow Pressure: 21 PSI Final Shut-in Pressure: 851 PSI Final Hydro Pressure: 2320 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4644 ft. |
Initial Flow: Strong blow. Bottom of bucket in 2 minutes. Initial Shut-In: No blow. Final Flow: Fair to strong blow. Bottom of bucket in 9 minutes. Final Shut-In: No blow. |
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Pipe 360 of Gas in pipe. 10 of Drilling mud. 6000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |