Drill Stem Tests Database
Specific Well--15-025-21180
API: 15-025-21180
Operator: Enron Oil and Gas Co.
Field: Mckinney
Lease: Theis
Well 7-3
Location: T35S R25W, Sec. 7, SW NE
3613 North, 1931 West, from SE corner
Longitude: -100.0767999
Latitude: 37.0173901
County: Clark
Status: GAS
Spud Date: 27-FEB-99
Completion Date: 11-MAR-99
Plugging Date:
Total Depth: 6250
Form. at depth: MISSISSIPPIAN
Elevation: 2182 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5882 to 6009
Formation tested: Morrow Sd
Date, Time: 10-MAR-99; 16:05:56
Initial Hydro Pressure: 2942 PSI
First Initial Flow Pressure: 493 PSI
First Final Flow Pressure: 834 PSI
Initial Shut-in Pressure: 2072 PSI
Second Initial Flow Pressure: 770 PSI
Second Final Flow Pressure: 976 PSI
Final Shut-in Pressure: 2075 PSI
Final Hydro Pressure: 2874 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 270 ft.
Drill Pipe Length: 5610 ft.
Initial Flow: Strong blow gas to surface in 7 mins.
Final Flow: Gas to surface
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples: gas sample
Gas Recovery:
Comments:
Recovery
390 of Total Fluid
270 of Fluid in Drill Collars
120 of Fluid in Drill Pipe
390 of gas cut mud 25%gas 75%mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.