API: 15-025-21195
Operator: Hummon Corporation Field: Snake Creek Lease: Tuttle Well 3-4 |
Location: T35S R21W, Sec. 4, W2 NW SW
1980 North, 360 East, from SW corner Longitude: -99.6121394 Latitude: 37.0230682 County: Clark Status: O&G |
Spud Date: 06-NOV-99
Completion Date: 21-NOV-99 Plugging Date: Total Depth: 5806 Form. at depth: LANSING Elevation: 1895 KB |
elog marked 1930 FSL 360 FWL - SKS 10/24/2000 |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4389 to 4455
Formation tested: Toronto | Date, Time: 13-NOV-99; 12:28:55 |
Initial Hydro Pressure: 2169 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 23 PSI Initial Shut-in Pressure: 1134 PSI Second Initial Flow Pressure: 30 PSI Second Final Flow Pressure: 25 PSI Final Shut-in Pressure: 920 PSI Final Hydro Pressure: 2080 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 537.81 ft. Drill Pipe Length: ft. |
Initial Flow: Weak surface blow died in 10 mins. Initial Shut-in: Bled down for 2 mins. No blow back Final Flow: No blow Final Shut-in: No blow back |
|
Bottom Hole Temperature: 103 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 20 of Very slight water cut mud 90%mud 10%Water | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5550 to 5594
Formation tested: Morrow | Date, Time: 19-NOV-99; 18:19:43 |
Initial Hydro Pressure: 2753 PSI
First Initial Flow Pressure: 59 PSI First Final Flow Pressure: 200 PSI Initial Shut-in Pressure: 1601 PSI Second Initial Flow Pressure: 52 PSI Second Final Flow Pressure: 77 PSI Final Shut-in Pressure: 1542 PSI Final Hydro Pressure: 2615 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 538 ft. Drill Pipe Length: 5003 ft. |
Initial Flow: Weak blow 1/4"" Initial Shut-in: No blow. Final Flow: Weak blow. (slow increase to 2"") Final Shut-in: No blow |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: 10 Samples: None Gas Recovery: Comments: | |
Recovery 90 of Total Fluid 90 of Fluid in Drill Collars 90 of Mud with a few oil specs. 7000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |