API: 15-033-21025
Operator: AMERICAN WARRIOR INC. Field: Wildcat Lease: Wagnon Well 1-9 |
Location: T33S R18W, Sec. 9, SW SW NE NE
1144 South, 1136 West, from NE corner Longitude: -99.2766292 Latitude: 37.1903834 County: Comanche Status: GAS-P&A |
Spud Date: 16-AUG-99
Completion Date: 14-SEP-99 Plugging Date: 12-OCT-23 Total Depth: 6200 Form. at depth: ARBUCKLE Elevation: 2087 KB |
DSTs mismarked 2083 KB. --CB 11/13/01 |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4857 to 4884
Formation tested: Kansas city (A) | Date, Time: 25-AUG-99; 10:11:51 |
Initial Hydro Pressure: 2382 PSI
First Initial Flow Pressure: 48 PSI First Final Flow Pressure: 146 PSI Initial Shut-in Pressure: 1787 PSI Second Initial Flow Pressure: 108 PSI Second Final Flow Pressure: 148 PSI Final Shut-in Pressure: 1794 PSI Final Hydro Pressure: 2330 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 294.42 ft. Drill Pipe Length: ft. |
IF:Strong blow b.o.b in 15 sec.G.T.S- in 6 mins. ISI:Bled down for 20 mins.no blow back. FF:Strong blow b.o.b in 10 sec.gauge gas FSI:Bled down for 20 mins.no blow back. | |
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: Caraway analytical Gas Recovery: Comments: | |
Recovery 105 of Total Fluid 105 of Fluid in Drill Collars 105 of SGCWM 2%gas Traceof water 96%mud 4742 of gas in pipe 10000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5115 to 5166
Formation tested: Pawnee/Fort Scott | Date, Time: 26-AUG-99; 18:14:54 |
Initial Hydro Pressure: 2505 PSI
First Initial Flow Pressure: 34 PSI First Final Flow Pressure: 57 PSI Initial Shut-in Pressure: 1852 PSI Second Initial Flow Pressure: 42 PSI Second Final Flow Pressure: 80 PSI Final Shut-in Pressure: 1833 PSI Final Hydro Pressure: 2458 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 294.42 ft. Drill Pipe Length: ft. |
Initial Flow: Strong blow bottom of bucket in 30 secs. gas to surface in 12 mins. Initial Shut-in: Bled down for 5 mins. no blow back Final Flow: Strong blow bottom of bucket in 10 secs. gauge gas Final Shut-in: Bled down for 20 mins. no blow back |
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 120 of Total Fluid 120 of Fluid in Drill Collars 4979 of Gas in pipe 120 of Slight gas cut muddy water | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |