Drill Stem Tests Database
Specific Well--15-033-21025
API: 15-033-21025
Operator: AMERICAN WARRIOR INC.
Field: Wildcat
Lease: Wagnon
Well 1-9
Location: T33S R18W, Sec. 9, SW SW NE NE
1144 South, 1136 West, from NE corner
Longitude: -99.2766292
Latitude: 37.1903834
County: Comanche
Status: GAS-P&A
Spud Date: 16-AUG-99
Completion Date: 14-SEP-99
Plugging Date: 12-OCT-23
Total Depth: 6200
Form. at depth: ARBUCKLE
Elevation: 2087 KB
DSTs mismarked 2083 KB. --CB 11/13/01
Test Number: 1 Data Source: TRILOBITE
Interval: 4857 to 4884
Formation tested: Kansas city (A)
Date, Time: 25-AUG-99; 10:11:51
Initial Hydro Pressure: 2382 PSI
First Initial Flow Pressure: 48 PSI
First Final Flow Pressure: 146 PSI
Initial Shut-in Pressure: 1787 PSI
Second Initial Flow Pressure: 108 PSI
Second Final Flow Pressure: 148 PSI
Final Shut-in Pressure: 1794 PSI
Final Hydro Pressure: 2330 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 294.42 ft.
Drill Pipe Length: ft.
IF:Strong blow b.o.b in 15 sec.G.T.S- in 6 mins. ISI:Bled down for 20 mins.no blow back. FF:Strong blow b.o.b in 10 sec.gauge gas FSI:Bled down for 20 mins.no blow back.
Bottom Hole Temperature: 114 DEG F
Percent Porosity:
Samples: Caraway analytical
Gas Recovery:
Comments:
Recovery
105 of Total Fluid
105 of Fluid in Drill Collars
105 of SGCWM 2%gas Traceof water 96%mud
4742 of gas in pipe
10000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5115 to 5166
Formation tested: Pawnee/Fort Scott
Date, Time: 26-AUG-99; 18:14:54
Initial Hydro Pressure: 2505 PSI
First Initial Flow Pressure: 34 PSI
First Final Flow Pressure: 57 PSI
Initial Shut-in Pressure: 1852 PSI
Second Initial Flow Pressure: 42 PSI
Second Final Flow Pressure: 80 PSI
Final Shut-in Pressure: 1833 PSI
Final Hydro Pressure: 2458 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 294.42 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 30 secs. gas to surface in 12 mins. Initial Shut-in: Bled down for 5 mins. no blow back
Final Flow: Strong blow bottom of bucket in 10 secs. gauge gas
Final Shut-in: Bled down for 20 mins. no blow back
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
4979 of Gas in pipe
120 of Slight gas cut muddy water
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.