API: 15-033-21043
Operator: DAYSTAR PETROLEUM, INC./KFG RESOURCES Field: Colter Lease: Lousch 'D' Well 1 |
Location: T32S R18W, Sec. 31, NE SW SE SW
559 North, 3476 West, from SE corner Longitude: -99.3216661 Latitude: 37.2093364 County: Comanche Status: GAS |
Spud Date: 14-DEC-99
Completion Date: 02-FEB-00 Plugging Date: Total Depth: 5898 Form. at depth: VIOLA Elevation: 2109 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3626 to 3640
Formation tested: Stotler Lm | Date, Time: 20-DEC-99; 06:41:28 |
Initial Hydro Pressure: 1612 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 1562 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3613 ft. |
Hit bridge at 3440. Tried to work thru. Would not go. | |
Bottom Hole Temperature: 86 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 3626 to 3640
Formation tested: Stotler Lm | Date, Time: 20-DEC-99; 17:32:32 |
Initial Hydro Pressure: 1769 PSI
First Initial Flow Pressure: 32 PSI First Final Flow Pressure: 37 PSI Initial Shut-in Pressure: 1304 PSI Second Initial Flow Pressure: 40 PSI Second Final Flow Pressure: 43 PSI Final Shut-in Pressure: 1230 PSI Final Hydro Pressure: 1750 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 120 ft. Drill Pipe Length: 3488 ft. |
Initial Flow: Weak steady 3/4"" blow. Final Flow: Weak steady surface blow. |
|
Bottom Hole Temperature: 92 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 20 of Drilling mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4756 to 4773
Formation tested: K.C.(Drum) | Date, Time: 27-DEC-99; 17:49:50 |
Initial Hydro Pressure: 2333 PSI
First Initial Flow Pressure: 28 PSI First Final Flow Pressure: 52 PSI Initial Shut-in Pressure: 1543 PSI Second Initial Flow Pressure: 50 PSI Second Final Flow Pressure: 76 PSI Final Shut-in Pressure: 1523 PSI Final Hydro Pressure: 2276 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4763 ft. |
Initial Flow: Strong blow. Bottom of bucket in 25 seconds. Initial Shut-In: Bled down for 2 minutes. Built back to weak surface blow. Final Flow: seconds. Gas to surface 15 seconds after closing tool. Final Shut-In: Bled down for 2 minutes. Built back to weak surface blow. |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 135 of Total Fluid 135 of Fluid in Drill Pipe 4628 of Gas in pipe 45 of Mud and gas cut water 90 of Slightly mud and gas cut water 145000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 4862 to 4883
Formation tested: K.C.(Swope) | Date, Time: 28-DEC-99; 15:01:57 |
Initial Hydro Pressure: 2445 PSI
First Initial Flow Pressure: 71 PSI First Final Flow Pressure: 116 PSI Initial Shut-in Pressure: 1124 PSI Second Initial Flow Pressure: 124 PSI Second Final Flow Pressure: 198 PSI Final Shut-in Pressure: 1080 PSI Final Hydro Pressure: 2351 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 4860 ft. |
Initial Flow: Strong blow. Bottom of bucket in 30 seconds. Gas to surface in 5 minutes. Guage gas. Initial Shut-In: Bled down for 5 minutes. Built back to weak surface blow. Final Flow: Strong blow. Bottom of bucket in 15 seconds. Guage gas. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: 124 DEG F
Percent Porosity: Samples: Caraway Analytical,728 N.Roosevelt Gas Recovery: Comments: | |
Recovery 467 of Total Fluid 467 of Fluid in Drill Pipe 4393 of Gas in pipe 67 of Gas cut muddy water 400 of Salt water 150000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 5081 to 5097
Formation tested: Altamont | Date, Time: 29-DEC-99; 19:28:23 |
Initial Hydro Pressure: 2550 PSI
First Initial Flow Pressure: 35 PSI First Final Flow Pressure: 47 PSI Initial Shut-in Pressure: 1606 PSI Second Initial Flow Pressure: 50 PSI Second Final Flow Pressure: 68 PSI Final Shut-in Pressure: 1576 PSI Final Hydro Pressure: 2500 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5076 ft. |
Initial Flow: Strong blow. Bottom of bucket in 10 seconds. Gas to surface in 14 minutes. Guage gas. Initial Shut-In: Bled down for 10 minutes. No blow back. Final Flow: Strong blow. Bottom of bucket in 10 seconds. Guage gas. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: Samples: Caraway Analytical,728 N.Roosevelt. Gas Recovery: Comments: | |
Recovery 55 of Total Fluid 55 of Fluid in Drill Pipe 5021 of Gas in pipe. 55 of Slightly gas cut mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 6 | Data Source: TRILOBITE |
Interval: 5139 to 5183
Formation tested: Pawnee Ft.Scott | Date, Time: 30-DEC-99; 15:13:15 |
Initial Hydro Pressure: 2548 PSI
First Initial Flow Pressure: 15 PSI First Final Flow Pressure: 15 PSI Initial Shut-in Pressure: 1633 PSI Second Initial Flow Pressure: 10 PSI Second Final Flow Pressure: 17 PSI Final Shut-in Pressure: 1628 PSI Final Hydro Pressure: 2469 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5138 ft. |
Initial Flow: Weak blow. Built to bottom of bucket in 8 minutes. Initial Shut-In: Bled down for 2 minutes. No blow back. Final Flow: Strong blow to bottom of bucket in 10 seconds. Gas to surface in 17 minutes. Guage gas. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Pipe 5118 of Gas in pipe 20 of Slightly Gas cut mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 7 | Data Source: TRILOBITE |
Interval: 5249 to 5275
Formation tested: upper (Miss) | Date, Time: 31-DEC-99; 13:00:14 |
Initial Hydro Pressure: 2568 PSI
First Initial Flow Pressure: 11 PSI First Final Flow Pressure: 3 PSI Initial Shut-in Pressure: 1770 PSI Second Initial Flow Pressure: 10 PSI Second Final Flow Pressure: 2 PSI Final Shut-in Pressure: 1703 PSI Final Hydro Pressure: 2490 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5229 ft. |
Initial Flow: Fair blow. Bottom of bucket in 40 Initial Shut-In: Bled down for 10 minutes. No blow back. Final Flow: Strong blow. Bottom of bucket in 10 seconds. Gas to surface in 2 minutes. Guage gas. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: Caraway Analytical 728 N.Roosevelt. Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Pipe 5524 of Gas in pipe 5 of Slightly gas cut mud | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 8 | Data Source: TRILOBITE |
Interval: 5865 to 5898
Formation tested: Viola | Date, Time: 03-JAN-00; 15:11:02 |
Initial Hydro Pressure: 2936 PSI
First Initial Flow Pressure: 44 PSI First Final Flow Pressure: 124 PSI Initial Shut-in Pressure: 1031 PSI Second Initial Flow Pressure: 131 PSI Second Final Flow Pressure: 261 PSI Final Shut-in Pressure: 960 PSI Final Hydro Pressure: 2926 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5854 ft. |
Initial Flow: Fair blow bottom of bucket in 4 minutes. Initial Shut-In: Bled down for 2 minutes. Built back to 1/2"". Died off to weak surface blow. Final Flow: Weak blow built to bottom of bucket in 19 minutes. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: 142 DEG F
Percent Porosity: Samples: Caraway Analytical Gas Recovery: Comments: | |
Recovery 445 of Total Fluid 445 of Fluid in Drill Pipe 840 of Gas in Pipe 45 of Mud cut gassy water 400 of Very slightly gas cut water 170000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |