API: 15-033-21048
Operator: CRAWFORD OIL & GAS ENERGIES Field: Collier Flats East Lease: Christopher Well 1 |
Location: T33S R19W, Sec. 29, SW SW
683 North, 4676 West, from SE corner Longitude: -99.4137236 Latitude: 37.1363809 County: Comanche Status: GAS-P&A |
Spud Date: 24-JAN-00
Completion Date: 18-MAY-00 Plugging Date: 24-JUL-23 Total Depth: 6180 Form. at depth: VIOLA Elevation: 1895 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5063 to 5094
Formation tested: Pawnee | Date, Time: 03-FEB-00; 00540155- |
Initial Hydro Pressure: 2489 PSI
First Initial Flow Pressure: 70 PSI First Final Flow Pressure: 84 PSI Initial Shut-in Pressure: 1775 PSI Second Initial Flow Pressure: 92 PSI Second Final Flow Pressure: 151 PSI Final Shut-in Pressure: 1783 PSI Final Hydro Pressure: 2371 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5071 ft. |
Initial Flow: Fair blow built to strong blow. Bottom of bucket in 1 minute. Decreased slightly. Initial Shut-In: 1/8"" blow back. Final Flow: Strong blow bottom of bucket in 45 seconds. Decreased slightly @ end of flow period. Final Shut-In: 1/8"" blow back. |
|
Bottom Hole Temperature: 118 48
Percent Porosity: 10 Samples: NONE Gas Recovery: Comments: | |
Recovery 270 of Total Fluid 270 of Fluid in Drill Pipe 1008 of Gas in pipe 90 of Gas cut mud with oil spots 180 of Mud cut water 93000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5231 to 5250
Formation tested: Mississippi | Date, Time: 04-FEB-00; 01:43:49 |
Initial Hydro Pressure: 2597 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 13 PSI Initial Shut-in Pressure: 1694 PSI Second Initial Flow Pressure: 11 PSI Second Final Flow Pressure: 11 PSI Final Shut-in Pressure: 1653 PSI Final Hydro Pressure: 2537 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5211 ft. |
Initial Flow: Bottom of bucket immediately. Gas to surface in 24 minutes. Initial Shut-In: Weak blow back. Died in 15 minutes. Final Flow: Bottom of bucket immediately. See gas flow charts. Final Shut-In: Weak blow back. Died in 10 minutes. |
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 15 Samples: Caught one sample Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Pipe 20 of Mud with oil spots | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |