API: 15-033-21050
Operator: Samuel Gary Jr. and Assoc., Inc. Field: Toni-Mike Northeast Lease: Webster Well 3-10 |
Location: T33S R19W, Sec. 3, NW SE
2032 North, 1975 West, from SE corner Longitude: -99.3700941 Latitude: 37.1985433 County: Comanche Status: GAS |
Spud Date: 18-JAN-00
Completion Date: 01-MAR-00 Plugging Date: Total Depth: 5400 Form. at depth: MISSISSIPPIAN Elevation: 1986 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5215 to 5274
Formation tested: Mississippi | Date, Time: 27-JAN-00; 22:26:23 |
Initial Hydro Pressure: 2591 PSI
First Initial Flow Pressure: 192 PSI First Final Flow Pressure: 199 PSI Initial Shut-in Pressure: 1578 PSI Second Initial Flow Pressure: 190 PSI Second Final Flow Pressure: 223 PSI Final Shut-in Pressure: 1555 PSI Final Hydro Pressure: 2512 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 297.45 ft. Drill Pipe Length: ft. |
Initial Flow: Strong blow bottom of bucket in 70 seconds. Gas to surface in 4 minutes. Initial Shut-In: Bled down for 20 minutes. Built back to weak 1/2"" in water bucket. Final Flow: Strong blow bottom of bucket in 10 seconds. Final Shut-In: Bled down for 20 minutes built back to 1/2"" in water bucket. |
|
Bottom Hole Temperature: 121 DEG F
Percent Porosity: Samples: Caraway analytical 728 N.Roosevelt Gas Recovery: Comments: | |
Recovery 378 of Total Fluid 297 of Fluid in Drill Collars 81 of Fluid in Drill Pipe 4805 of Gas in pipe. 100 of Very slightly gas cut mud 278 of Slightly gas & water cut mud 12000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5042 to 5100
Formation tested: Pawnee | Date, Time: 25-JAN-00; 15:44:38 |
Initial Hydro Pressure: 2525 PSI
First Initial Flow Pressure: 41 PSI First Final Flow Pressure: 100 PSI Initial Shut-in Pressure: 1676 PSI Second Initial Flow Pressure: 32 PSI Second Final Flow Pressure: 53 PSI Final Shut-in Pressure: 1680 PSI Final Hydro Pressure: 2411 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 297.45 ft. Drill Pipe Length: ft. |
Intitial Flow: Fair blow. Bottom of bucket in 5 minutes. Intial Shut-In: Bled down for 5 minutes. No blow back Final Flow: Strong blow. Bottom of bucket in 10 seconds. Final Shut-In: Bled down for 10 minutes. No blow back. |
|
Bottom Hole Temperature: 119 DEG F
Percent Porosity: Samples: Caraway analytical Gas Recovery: Comments: | |
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 4947 of Gas in pipe 60 of Very slightly gas cut mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |