Drill Stem Tests Database
Specific Well--15-033-21051
API: 15-033-21051
Operator: THOROUGHBRED ASSOCIATES LLC.
Field: Protection
Lease: Kaci
Well 1
Location: T32S R19W, Sec. 20, SE NW NE NE
4665 North, 964 West, from SE corner
Longitude: -99.4037133
Latitude: 37.2491526
County: Comanche
Status: GAS-P&A
Spud Date: 20-JAN-00
Completion Date: 19-FEB-00
Plugging Date: 01-JUN-17
Total Depth: 5925
Form. at depth: ARBUCKLE
Elevation: 1982 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4931 to 4971
Formation tested: Altamont
Date, Time: 28-JAN-00; 04:53:55
Initial Hydro Pressure: 2423 PSI
First Initial Flow Pressure: 45 PSI
First Final Flow Pressure: 65 PSI
Initial Shut-in Pressure: 1148 PSI
Second Initial Flow Pressure: 67 PSI
Second Final Flow Pressure: 82 PSI
Final Shut-in Pressure: 1115 PSI
Final Hydro Pressure: 2306 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4673 ft.
Intitial Flow: Strong blow. Bottom of bucket in 2 minutes. Initial Shut-In: No blow.
Final Flow: Strong blow. Bottom of bucket in 5-10 seconds.
Final Shut-In: No blow. Comment: AK-1 chart on
Final shut-in false. Clock stopped.
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
180 of Total Fluid
180 of Fluid in Drill Collars
4000 of Gas in pipe.
20 of Gas cut mud.
40 of Slightly oil cut gassy mud
120 of Slightly oil cut gassy mud
5000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5067 to 5180
Formation tested: Mississippi
Date, Time: 29-JAN-00; 07:33:22
Initial Hydro Pressure: 2520 PSI
First Initial Flow Pressure: 240 PSI
First Final Flow Pressure: 160 PSI
Initial Shut-in Pressure: 1780 PSI
Second Initial Flow Pressure: 170 PSI
Second Final Flow Pressure: 170 PSI
Final Shut-in Pressure: 1775 PSI
Final Hydro Pressure: 2462 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4822 ft.
Initial Flow: Strong blow. Gas to surface in 6 minutes. (see gas volume report) Initial Shut-In: No blow.
Final Flow: Strong blow. (see gas volume report)
Final Shut-In: No blow.
Bottom Hole Temperature: 124 DEG F
Percent Porosity: 13
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
320 of Total Fluid
240 of Fluid in Drill Collars
80 of Fluid in Drill Pipe
4742 of Gas in all fluid free pipe.
80 of Watery mud
240 of Gas cut mud
7800 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.