|
API: 15-033-21052
Operator: CRAWFORD OIL & GAS INC. Field: Deewall Lease: O. Deewall Well 1 |
Location: T33S R18W, Sec. 30, SW SW NE
2992 North, 2285 West, from SE corner Longitude: -99.3155561 Latitude: 37.1433031 County: Comanche Status: GAS-P&A |
Spud Date: 22-FEB-00
Completion Date: 30-MAR-00 Plugging Date: 21-JUN-18 Total Depth: 6100 Form. at depth: VIOLA Elevation: 1956 KB |
| also Comanche Operating, LLC | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5284 to 5312
Formation tested: Mississippi | Date, Time: 03-MAR-00; 12:22:26 |
|
Initial Hydro Pressure: 2506 PSI
First Initial Flow Pressure: 710 PSI First Final Flow Pressure: 434 PSI Initial Shut-in Pressure: 1412 PSI Second Initial Flow Pressure: 559 PSI Second Final Flow Pressure: 307 PSI Final Shut-in Pressure: 1141 PSI Final Hydro Pressure: 2477 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5266 ft. |
|
Initial Flow: Strong blow bottom of bucket immediately. Gas to surface in 2 minutes. Initial Shut-In: Blow back. Final Flow: Strong blow. Bottom of bucket immediately. (See gas flow chart). Final Shut-In: Blow back. Gas will burn. |
|
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: 14 Samples: Caught one sample Gas Recovery: Comments: | |
|
Recovery 100 of Total Fluid 100 of Fluid in Drill Pipe 5166 of Gas in pipe. 100 of Drilling mud | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5340 to 5406
Formation tested: Mississippi | Date, Time: 04-MAR-00; 10:27:10 |
|
Initial Hydro Pressure: 2645 PSI
First Initial Flow Pressure: 58 PSI First Final Flow Pressure: 125 PSI Initial Shut-in Pressure: 1622 PSI Second Initial Flow Pressure: 131 PSI Second Final Flow Pressure: 212 PSI Final Shut-in Pressure: 1572 PSI Final Hydro Pressure: 2594 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5357 ft. |
|
Initial Flow: Strong blow. Bottom of bucket in 20 seconds. Initial Shut-In: Bled down for 4 minutes. Built back to 1 1/2"" in water bucket. Final Flow: Strong blow bottom of bucket in 10 seconds. Gas to surface in 5 minutes. Gauged gas. Final Shut-In: Bled down for 10 minutes. Built back to 1 1/2"" in water bucket. |
|
|
Bottom Hole Temperature: 130 DEG F
Percent Porosity: Samples: Caraway Analytical,728.N Roosevelt Gas Recovery: Comments: | |
|
Recovery 454 of Total Fluid 454 of Fluid in Drill Pipe 4842 of Gas in pipe. 120 of Gas & oil cut muddy water 120 of Gas & oil cut watery mud 214 of Oil & gas cut muddy water 130000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |