Drill Stem Tests Database
Specific Well--15-033-21052
API: 15-033-21052
Operator: CRAWFORD OIL & GAS INC.
Field: Deewall
Lease: O. Deewall
Well 1
Location: T33S R18W, Sec. 30, SW SW NE
2992 North, 2285 West, from SE corner
Longitude: -99.3155561
Latitude: 37.1433031
County: Comanche
Status: GAS-P&A
Spud Date: 22-FEB-00
Completion Date: 30-MAR-00
Plugging Date: 21-JUN-18
Total Depth: 6100
Form. at depth: VIOLA
Elevation: 1956 KB
also Comanche Operating, LLC

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5284 to 5312
Formation tested: Mississippi
Date, Time: 03-MAR-00; 12:22:26
Initial Hydro Pressure: 2506 PSI
First Initial Flow Pressure: 710 PSI
First Final Flow Pressure: 434 PSI
Initial Shut-in Pressure: 1412 PSI
Second Initial Flow Pressure: 559 PSI
Second Final Flow Pressure: 307 PSI
Final Shut-in Pressure: 1141 PSI
Final Hydro Pressure: 2477 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5266 ft.
Initial Flow: Strong blow bottom of bucket immediately. Gas to surface in 2 minutes. Initial Shut-In: Blow back.
Final Flow: Strong blow. Bottom of bucket immediately. (See gas flow chart).
Final Shut-In: Blow back. Gas will burn.
Bottom Hole Temperature: 118 DEG F
Percent Porosity: 14
Samples: Caught one sample
Gas Recovery:
Comments:
Recovery
100 of Total Fluid
100 of Fluid in Drill Pipe
5166 of Gas in pipe.
100 of Drilling mud
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5340 to 5406
Formation tested: Mississippi
Date, Time: 04-MAR-00; 10:27:10
Initial Hydro Pressure: 2645 PSI
First Initial Flow Pressure: 58 PSI
First Final Flow Pressure: 125 PSI
Initial Shut-in Pressure: 1622 PSI
Second Initial Flow Pressure: 131 PSI
Second Final Flow Pressure: 212 PSI
Final Shut-in Pressure: 1572 PSI
Final Hydro Pressure: 2594 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5357 ft.
Initial Flow: Strong blow. Bottom of bucket in 20 seconds. Initial Shut-In: Bled down for 4 minutes. Built back to 1 1/2"" in water bucket.
Final Flow: Strong blow bottom of bucket in 10 seconds. Gas to surface in 5 minutes. Gauged gas.
Final Shut-In: Bled down for 10 minutes. Built back to 1 1/2"" in water bucket.
Bottom Hole Temperature: 130 DEG F
Percent Porosity:
Samples: Caraway Analytical,728.N Roosevelt
Gas Recovery:
Comments:
Recovery
454 of Total Fluid
454 of Fluid in Drill Pipe
4842 of Gas in pipe.
120 of Gas & oil cut muddy water
120 of Gas & oil cut watery mud
214 of Oil & gas cut muddy water
130000 of Salinity (PPM)
View Pressures View Recovery Gas