Drill Stem Tests Database
Specific Well--15-033-21058
API: 15-033-21058
Operator: CRAWFORD OIL & GAS INC.
Field: Buttermilk East
Lease: R. Blount
Well 1
Location: T33S R18W, Sec. 34, SE NE SE
1613 North, 318 West, from SE corner
Longitude: -99.2536483
Latitude: 37.1251031
County: Comanche
Status: O&G
Spud Date: 08-MAY-00
Completion Date: 31-MAY-00
Plugging Date:
Total Depth: 6030
Form. at depth: VIOLA
Elevation: 1899 KB
Some documents mismarked O. Blount 3.

Download DST Test Data

Test Number: 2 Data Source: TRILOBITE
Interval: 5230 to 5323
Formation tested: Mississippi
Date, Time: 19-MAY-00; 18:06:30
Initial Hydro Pressure: 2575 PSI
First Initial Flow Pressure: 40 PSI
First Final Flow Pressure: 40 PSI
Initial Shut-in Pressure: 420 PSI
Second Initial Flow Pressure: 28 PSI
Second Final Flow Pressure: 41 PSI
Final Shut-in Pressure: 353 PSI
Final Hydro Pressure: 2590 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5214 ft.
Initial Flow: Strong bottom of bucket in 1 minute.
Final Flow: Strong bottom of bucket as soon as tool opened.
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples: Bottle filled
Gas Recovery:
Comments:
Recovery
70 of Total Fluid
70 of Fluid in Drill Pipe
70 of Gassy mud
View Pressures View Recovery Gas
 
Test Number: 1 Data Source: TRILOBITE
Interval: 5082 to 5108
Formation tested: Pawnee
Date, Time: 18-MAY-00; 07:32:50
Initial Hydro Pressure: 2518 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 49 PSI
Initial Shut-in Pressure: 1833 PSI
Second Initial Flow Pressure: 52 PSI
Second Final Flow Pressure: 72 PSI
Final Shut-in Pressure: 1798 PSI
Final Hydro Pressure: 2486 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5088 ft.
Initial Flow: Strong bottom of bucket in 15 seconds Gas to surface in 18 minutes.
Final Flow: Strong bottom of bucket as soon as tool opened.
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples: Gas bottle filled
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Pipe
90 of Gassy mud
30 of Muddy water
125000 of Salinity (PPM)
View Pressures View Recovery Gas