|
API: 15-033-21058
Operator: CRAWFORD OIL & GAS INC. Field: Buttermilk East Lease: R. Blount Well 1 |
Location: T33S R18W, Sec. 34, SE NE SE
1613 North, 318 West, from SE corner Longitude: -99.2536483 Latitude: 37.1251031 County: Comanche Status: O&G |
Spud Date: 08-MAY-00
Completion Date: 31-MAY-00 Plugging Date: Total Depth: 6030 Form. at depth: VIOLA Elevation: 1899 KB |
| Some documents mismarked O. Blount 3. | ||
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5230 to 5323
Formation tested: Mississippi | Date, Time: 19-MAY-00; 18:06:30 |
|
Initial Hydro Pressure: 2575 PSI
First Initial Flow Pressure: 40 PSI First Final Flow Pressure: 40 PSI Initial Shut-in Pressure: 420 PSI Second Initial Flow Pressure: 28 PSI Second Final Flow Pressure: 41 PSI Final Shut-in Pressure: 353 PSI Final Hydro Pressure: 2590 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5214 ft. |
|
Initial Flow: Strong bottom of bucket in 1 minute. Final Flow: Strong bottom of bucket as soon as tool opened. |
|
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: Bottle filled Gas Recovery: Comments: | |
|
Recovery 70 of Total Fluid 70 of Fluid in Drill Pipe 70 of Gassy mud | |
| View Pressures | View Recovery Gas |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5082 to 5108
Formation tested: Pawnee | Date, Time: 18-MAY-00; 07:32:50 |
|
Initial Hydro Pressure: 2518 PSI
First Initial Flow Pressure: 30 PSI First Final Flow Pressure: 49 PSI Initial Shut-in Pressure: 1833 PSI Second Initial Flow Pressure: 52 PSI Second Final Flow Pressure: 72 PSI Final Shut-in Pressure: 1798 PSI Final Hydro Pressure: 2486 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5088 ft. |
|
Initial Flow: Strong bottom of bucket in 15 seconds Gas to surface in 18 minutes. Final Flow: Strong bottom of bucket as soon as tool opened. |
|
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: Gas bottle filled Gas Recovery: Comments: | |
|
Recovery 120 of Total Fluid 120 of Fluid in Drill Pipe 90 of Gassy mud 30 of Muddy water 125000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |