Drill Stem Tests Database
Specific Well--15-047-21441
API: 15-047-21441
Operator: McCoy Petroleum Corp.
Field: Wildcat
Lease: Speirs 'A'
Well 1-30
Location: T26S R20W, Sec. 30, SE NE
1980 South, 660 West, from NE corner
Longitude: -99.5440382
Latitude: 37.7579716
County: Edwards
Status: O&G-P&A
Spud Date: 01-MAR-00
Completion Date: 30-MAR-00
Plugging Date: 19-MAY-22
Total Depth: 4795
Form. at depth: MISSISSIPPIAN
Elevation: 2263 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4786 to 4795
Formation tested: Mississippi
Date, Time: 09-MAR-00; 12:22:08
Initial Hydro Pressure: 2342 PSI
First Initial Flow Pressure: 430 PSI
First Final Flow Pressure: 790 PSI
Initial Shut-in Pressure: 1521 PSI
Second Initial Flow Pressure: 785 PSI
Second Final Flow Pressure: 1091 PSI
Final Shut-in Pressure: 1508 PSI
Final Hydro Pressure: 2344 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4767 ft.
Initial Flow: Strong blow gas to surface in 5 minutes.
Final Flow: Strong blow gas to surface. Flowed oil 28 minutes into second flow. Grindout in bottom of water truck.
Bottom Hole Temperature: 125 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
4767 of Total Fluid
4767 of Fluid in Drill Pipe
4647 of Oil & water
120 of Muddy water with show of oil
13000 of Salinity (PPM)
34 of Gravity (API)
View Pressures No Recovery Gas data.