API: 15-051-25016
Operator: IMPERIAL AMERICAN OIL CORP Field: Phoenix Lease: Vada Belle Unit Well 18-1 |
Location: T11S R19W, Sec. 18, NE NE SE SE
1290 North, 100 West, from SE corner Longitude: -99.4632381 Latitude: 39.0920153 County: Ellis Status: OIL |
Spud Date: 01-FEB-00
Completion Date: 01-MAR-00 Plugging Date: Total Depth: 3646 Form. at depth: ARBUCKLE Elevation: 2004 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 3320 to 3358
Formation tested: Lansing F-G | Date, Time: 07-FEB-00; 06:20:48 |
Initial Hydro Pressure: 1605 PSI
First Initial Flow Pressure: 32 PSI First Final Flow Pressure: 187 PSI Initial Shut-in Pressure: 646 PSI Second Initial Flow Pressure: 193 PSI Second Final Flow Pressure: 262 PSI Final Shut-in Pressure: 574 PSI Final Hydro Pressure: 1579 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 521 ft. Drill Pipe Length: 2801 ft. |
Initial Flow: Weak to a strong blow in 12 minutes. Final Flow: Weak to a good blow 1/2"" to 8"" blow. Final Shut-In: No blow. |
|
Bottom Hole Temperature: 104 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 645 of Total Fluid 521 of Fluid in Drill Collars 124 of Fluid in Drill Pipe 375 of Gas in pipe 360 of Clean Oil 225 of Slightly muddy gassy oil 60 of Muddy gassy oil 30 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 3407 to 3482
Formation tested: Lansing I-J | Date, Time: 08-FEB-00; 04:46:48 |
Initial Hydro Pressure: 1681 PSI
First Initial Flow Pressure: 28 PSI First Final Flow Pressure: 107 PSI Initial Shut-in Pressure: 1105 PSI Second Initial Flow Pressure: 120 PSI Second Final Flow Pressure: 216 PSI Final Shut-in Pressure: 1098 PSI Final Hydro Pressure: 1637 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 521 ft. Drill Pipe Length: 2896 ft. |
Initial Flow: Weak to a good blow. 1/2"" to 6"" blow. Final Flow: Weak to a fair blow. 1/2"" to 4"" blow. Final Shut-In: No blow. |
|
Bottom Hole Temperature: 101 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 425 of Total Fluid 425 of Fluid in Drill Collars 360 of Gas in pipe 245 of clean oil 120 of Gassy muddy oil 60 of Gassy muddy oil 29 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 3564 to 3579
Formation tested: Arbuckle | Date, Time: 09-FEB-00; 00:32:28 |
Initial Hydro Pressure: 1734 PSI
First Initial Flow Pressure: 93 PSI First Final Flow Pressure: 559 PSI Initial Shut-in Pressure: 1138 PSI Second Initial Flow Pressure: 568 PSI Second Final Flow Pressure: 875 PSI Final Shut-in Pressure: 1133 PSI Final Hydro Pressure: 1722 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 521 ft. Drill Pipe Length: 3051 ft. |
Initial Flow: Weak to a strong blow in 2 minutes. Final Flow: Strong blow throughout. Final Shut-In: Had blow back. |
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 2140 of Total Fluid 521 of Fluid in Drill Collars 1619 of Fluid in Drill Pipe 2140 of Clean oil 25 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 3254 to 3325
Formation tested: LKC A-D | Date, Time: 06-FEB-00; 13:25:00 |
Initial Hydro Pressure: 1605 PSI
First Initial Flow Pressure: 52 PSI First Final Flow Pressure: 291 PSI Initial Shut-in Pressure: 801 PSI Second Initial Flow Pressure: 298 PSI Second Final Flow Pressure: 421 PSI Final Shut-in Pressure: 798 PSI Final Hydro Pressure: 1574 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 521 ft. Drill Pipe Length: 2739 ft. |
Initial Flow: Weak to a strong blow in 8 minutes. Final Flow: Weak to a good blow 1/2"" to 8"" blow. Final Shut-In: No blow. |
|
Bottom Hole Temperature: 106 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 870 of Total Fluid 521 of Fluid in Drill Collars 349 of Fluid in Drill Pipe 60 of Gas in pipe 30 of Muddy gassy oil 5% gas 87% oil 8% mud 180 of Heavily oil & gas cut watery mud 60 of Oil & gas cut muddy water 60 of Oil & gas cut muddy water 10%g 6%o 79%w 5%m 540 of Water 100% water 43000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 3580 to 3590
Formation tested: Arbuckle | Date, Time: 09-FEB-00; 16:53:23 |
Initial Hydro Pressure: 1729 PSI
First Initial Flow Pressure: 382 PSI First Final Flow Pressure: 728 PSI Initial Shut-in Pressure: 1137 PSI Second Initial Flow Pressure: 680 PSI Second Final Flow Pressure: 777 PSI Final Shut-in Pressure: 1136 PSI Final Hydro Pressure: 1723 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 521 ft. Drill Pipe Length: 3053 ft. |
Initial Flow: Strong blow throughout. Final Flow: Strong blow throughout. Final Shut-In: Had blow back. |
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1760 of Total Fluid 521 of Fluid in Drill Collars 1239 of Fluid in Drill Pipe 1760 of Clean oil 25 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |