Drill Stem Tests Database
Specific Well--15-051-25019
API: 15-051-25019
Operator: HESS OIL CO
Field: Gasaway
Lease: TEET-BILL
Well 1-2
Location: T11S R19W, Sec. 2, S2 S2 SE NW
2560 South, 1850 East, from NW corner
Longitude: -99.3996201
Latitude: 39.1256483
County: Ellis
Status: OIL
Spud Date: 20-JAN-00
Completion Date: 22-FEB-00
Plugging Date:
Total Depth: 3700
Form. at depth: ARBUCKLE
Elevation: 2090 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3030 to 3057
Formation tested: Topeka
Date, Time: 24-JAN-00; 19:40:35
Initial Hydro Pressure: 1406 PSI
First Initial Flow Pressure: 43 PSI
First Final Flow Pressure: 83 PSI
Initial Shut-in Pressure: 806 PSI
Second Initial Flow Pressure: 86 PSI
Second Final Flow Pressure: 94 PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1396 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 237 ft.
Drill Pipe Length: 2798 ft.
Initial Flow: Tool slid 7' when opening and then slid 2' more during initial flow. Bled off blow & had surface blow building to 1/2"".
Final Flow: Very weak surface blow (tool slid another 6"".)
Final Shut-In: None taken.
Bottom Hole Temperature: 90 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
150 of Total Fluid
150 of Fluid in Drill Collars
120 of Slightly oil cut mud
30 of Slightly oil cut mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3297 to 3362
Formation tested: Kansas City
Date, Time: 26-JAN-00; 01:55:50
Initial Hydro Pressure: 1586 PSI
First Initial Flow Pressure: 94 PSI
First Final Flow Pressure: 445 PSI
Initial Shut-in Pressure: 830 PSI
Second Initial Flow Pressure: 458 PSI
Second Final Flow Pressure: 607 PSI
Final Shut-in Pressure: 825 PSI
Final Hydro Pressure: 1540 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 3054 ft.
Intial Flow: Strong blow- bottom of bucket in 90 seconds. Initial Shut-In: Blow built to bottom of bucket in 7 minutes.
Final Flow: Strong blow bottom of bucket in 3 minutes.
Final Shut-In: Blow built to bottom of bucket in 8 minutes.
Bottom Hole Temperature: 104 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1575 of Total Fluid
235 of Fluid in Drill Collars
1340 of Fluid in Drill Pipe
1095 of Gas in pipe
1575 of Gassy oil
36 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3364 to 3410
Formation tested: Kansas City 'G'
Date, Time: 26-JAN-00; 18:12:40
Initial Hydro Pressure: 1640 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 25 PSI
Initial Shut-in Pressure: 796 PSI
Second Initial Flow Pressure: 27 PSI
Second Final Flow Pressure: 31 PSI
Final Shut-in Pressure: 763 PSI
Final Hydro Pressure: 1560 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 3116 ft.
Initial Flow: Weak 1/2"" blow built to 1 1/4"". Initial Shut-In: No blow.
Final Flow: Weak surface blow.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
20 of Oil specked slightly water cut mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 3408 to 3440
Formation tested: Kansas City 'H'
Date, Time: 27-JAN-00; 06:10:46
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 3176 ft.
Initial Flow: Packer failure. Tried twice.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
250 of Total Fluid
235 of Fluid in Drill Collars
15 of Fluid in Drill Pipe
250 of Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 3444 to 3500
Formation tested: Kansas City 'J-L'
Date, Time: 28-JAN-00; 03:32:32
Initial Hydro Pressure: 1676 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 87 PSI
Initial Shut-in Pressure: 1138 PSI
Second Initial Flow Pressure: 97 PSI
Second Final Flow Pressure: 129 PSI
Final Shut-in Pressure: 1129 PSI
Final Hydro Pressure: 1657 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 3207 ft.
Initial Flow: 3/4"" blow building to 9"". Initial Shut-In: Weak surface blow.
Final Flow: 1/2"" blow building to 7"".
Final Shut-In: Surface blow throughout.
Bottom Hole Temperature: 102 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
265 of Total Fluid
235 of Fluid in Drill Collars
30 of Fluid in Drill Pipe
30 of Gas in pipe
30 of Clean oil
60 of Muddy oil
60 of Gassy oil & water cut mud
115 of Slightly oil & water cut mud
22000 of Salinity (PPM)
24 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 7 Data Source: TRILOBITE
Interval: 3494 to 3606
Formation tested: Simpson/Arbuckle'
Date, Time: 29-JAN-00; 22:21:44
Initial Hydro Pressure: 1721 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 78 PSI
Initial Shut-in Pressure: 1248 PSI
Second Initial Flow Pressure: 85 PSI
Second Final Flow Pressure: 119 PSI
Final Shut-in Pressure: 1019 PSI
Final Hydro Pressure: 1675 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 3269 ft.
Initial Flow Weak 1"" blow surging & building to 5"".
Final Flow: Surface blow building to 4"".
Bottom Hole Temperature: 98 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
250 of Total Fluid
235 of Fluid in Drill Collars
15 of Fluid in Drill Pipe
135 of Clean gassy oil
115 of Slightly oil cut mud
28 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 8 Data Source: TRILOBITE
Interval: 3604 to 3616
Formation tested: Arbuckle
Date, Time: 29-JAN-00; 13:39:44
Initial Hydro Pressure: 1784 PSI
First Initial Flow Pressure: 752 PSI
First Final Flow Pressure: 1019 PSI
Initial Shut-in Pressure: 1154 PSI
Second Initial Flow Pressure: 1081 PSI
Second Final Flow Pressure: 1150 PSI
Final Shut-in Pressure: 1157 PSI
Final Hydro Pressure: 1737 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 3362 ft.
Initial Flow: Strong blow building to bottom of bucket in 40 seconds. Initial Shut-In: Weak surface blow.
Final Flow: Strong blow building to bottom of bucket in 90 seconds.
Final Shut-In: No blow.
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2540 of Total Fluid
235 of Fluid in Drill Collars
2305 of Fluid in Drill Pipe
2540 of Salt water
30000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.