Drill Stem Tests Database
Specific Well--15-055-21654
API: 15-055-21654
Operator: Helmerich and Payne, Inc.
Field: Toni-Mike Northeast
Lease: Bedford 'B'
Well 2
Location: T26S R34W, Sec. 9, SW NE NE
1250 South, 850 West, from NE corner
Longitude: -101.037976
Latitude: 37.8058372
County: Finney
Status: OIL
Spud Date: 11-NOV-99
Completion Date: 03-APR-00
Plugging Date:
Total Depth: 2958
Form. at depth: ST LOUIS
Elevation: 2968 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4526 to 4590
Formation tested: Pawnee,Ft.Scott,Cher
Date, Time: 17-NOV-99; 18:00:29
Initial Hydro Pressure: 2104 PSI
First Initial Flow Pressure: 161 PSI
First Final Flow Pressure: 214 PSI
Initial Shut-in Pressure: 1279 PSI
Second Initial Flow Pressure: 282 PSI
Second Final Flow Pressure: 312 PSI
Final Shut-in Pressure: 1272 PSI
Final Hydro Pressure: 2088 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 591 ft.
Drill Pipe Length: 3913 ft.
Initial Flow: Weak 1"", built to strong off bottom of bucket in 10 mins. Initial Shut-in: Strong off bottom of bucket blow-back
Final Flow: Weak 1"", built to strong off bottom of bucket in 9 mins.
Final Shut-in: Strong off bottom of bucket blow back Gas to surface Remarks: Est. 15 ft. of pay.
Bottom Hole Temperature: 118 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
930 of Total Fluid
591 of Fluid in Drill Collars
339 of Fluid in Drill Pipe
3574 of Gas in pipe
90 of Oil & Gas cut Mud 9% Gas 8% Oil 83% Mud
430 of Slight Mud cut Gassy Oil
410 of Clean gassy oil 44% gas 56% oil
36 of Gravity (API)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5002 to 5060
Formation tested: St Louis
Date, Time: 19-NOV-99; 17:30:44
Initial Hydro Pressure: 2429 PSI
First Initial Flow Pressure: 52 PSI
First Final Flow Pressure: 127 PSI
Initial Shut-in Pressure: 1190 PSI
Second Initial Flow Pressure: 159 PSI
Second Final Flow Pressure: 262 PSI
Final Shut-in Pressure: 1170 PSI
Final Hydro Pressure: 2393 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 590 ft.
Drill Pipe Length: 4411 ft.
Initial Flow: Fair to strong blow off bottom in 5 mins. Initial Shut-in: Surface return built to bottom in 10 mins.
Final Flow: Fair to strong blow off bottom in
Final Shut-in: Surface return built to bottom in 10 mins.
Bottom Hole Temperature: 127 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
838 of Total Fluid
590 of Fluid in Drill Collars
248 of Fluid in Drill Pipe
2790 of Gas in pie
538 of Clean gassy oil 40%gas 60%oil
300 of Heavy gassy mud cut oil 30%gas 50%oil 20%mud
36 of Gravity (API)
View Pressures No Recovery Gas data.