|
API: 15-055-21654
Operator: Helmerich and Payne, Inc. Field: Toni-Mike Northeast Lease: Bedford 'B' Well 2 |
Location: T26S R34W, Sec. 9, SW NE NE
1250 South, 850 West, from NE corner Longitude: -101.037976 Latitude: 37.8058372 County: Finney Status: OIL |
Spud Date: 11-NOV-99
Completion Date: 03-APR-00 Plugging Date: Total Depth: 2958 Form. at depth: ST LOUIS Elevation: 2968 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4526 to 4590
Formation tested: Pawnee,Ft.Scott,Cher | Date, Time: 17-NOV-99; 18:00:29 |
|
Initial Hydro Pressure: 2104 PSI
First Initial Flow Pressure: 161 PSI First Final Flow Pressure: 214 PSI Initial Shut-in Pressure: 1279 PSI Second Initial Flow Pressure: 282 PSI Second Final Flow Pressure: 312 PSI Final Shut-in Pressure: 1272 PSI Final Hydro Pressure: 2088 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 591 ft. Drill Pipe Length: 3913 ft. |
|
Initial Flow: Weak 1"", built to strong off bottom of bucket in 10 mins. Initial Shut-in: Strong off bottom of bucket blow-back Final Flow: Weak 1"", built to strong off bottom of bucket in 9 mins. Final Shut-in: Strong off bottom of bucket blow back Gas to surface Remarks: Est. 15 ft. of pay. |
|
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: 10 Samples: None Gas Recovery: Comments: | |
|
Recovery 930 of Total Fluid 591 of Fluid in Drill Collars 339 of Fluid in Drill Pipe 3574 of Gas in pipe 90 of Oil & Gas cut Mud 9% Gas 8% Oil 83% Mud 430 of Slight Mud cut Gassy Oil 410 of Clean gassy oil 44% gas 56% oil 36 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5002 to 5060
Formation tested: St Louis | Date, Time: 19-NOV-99; 17:30:44 |
|
Initial Hydro Pressure: 2429 PSI
First Initial Flow Pressure: 52 PSI First Final Flow Pressure: 127 PSI Initial Shut-in Pressure: 1190 PSI Second Initial Flow Pressure: 159 PSI Second Final Flow Pressure: 262 PSI Final Shut-in Pressure: 1170 PSI Final Hydro Pressure: 2393 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 590 ft. Drill Pipe Length: 4411 ft. |
|
Initial Flow: Fair to strong blow off bottom in 5 mins. Initial Shut-in: Surface return built to bottom in 10 mins. Final Flow: Fair to strong blow off bottom in Final Shut-in: Surface return built to bottom in 10 mins. |
|
|
Bottom Hole Temperature: 127 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 838 of Total Fluid 590 of Fluid in Drill Collars 248 of Fluid in Drill Pipe 2790 of Gas in pie 538 of Clean gassy oil 40%gas 60%oil 300 of Heavy gassy mud cut oil 30%gas 50%oil 20%mud 36 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |