Drill Stem Tests Database
Specific Well--15-067-21454
API: 15-067-21454
Operator: ZINKE & TRUMBO INC
Field: Wildcat
Lease: PARR
Well 1-27
Location: T30S R38W, Sec. 27, SW NW
2196 South, 766 East, from NW corner
Longitude: -101.4679331
Latitude: 37.411174
County: Grant
Status: GAS-P&A
Spud Date: 28-SEP-99
Completion Date: 16-NOV-99
Plugging Date: 18-APR-01
Total Depth: 5700
Form. at depth: ST GENEVIEVE
Elevation: 3148 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5225 to 5367
Formation tested: Upper Morrow
Date, Time: 05-OCT-99; 17:23:50
Initial Hydro Pressure: 2691 PSI
First Initial Flow Pressure: 804 PSI
First Final Flow Pressure: 872 PSI
Initial Shut-in Pressure: 972 PSI
Second Initial Flow Pressure: 852 PSI
Second Final Flow Pressure: 904 PSI
Final Shut-in Pressure: 975 PSI
Final Hydro Pressure: 2563 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5334 ft.
Initial Flow: Strong blow bottom of bucket in 1 min. gas to surface in 5 mins. 18 mins. misting mud MCF at 5543
Final Flow: Strong blow bottom of bucket as soon as open tool gas MCF at 4946
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 15
Samples: Yes 1
Gas Recovery:
Comments:
Recovery
1 of Total Fluid
1 of Fluid in Drill Pipe
1 of Drilling mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.