API: 15-081-21238
Operator: Field: Eubank Lease: MLP Rooney Ranch Well 1-4 |
Location: T30S R34W, Sec. 4, W2 SW NW
2000 South, 465 East, from NW corner Longitude: -101.0511261 Latitude: 37.4694754 County: Haskell Status: D&A |
Spud Date: 10-APR-99
Completion Date: 23-APR-99 Plugging Date: 23-APR-99 Total Depth: 5760 Form. at depth: MISSISSIPPIAN Elevation: 2994 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5566 to 5620
Formation tested: Chester | Date, Time: 21-APR-99; 15:46:12 |
Initial Hydro Pressure: 2700 PSI
First Initial Flow Pressure: 38 PSI First Final Flow Pressure: 163 PSI Initial Shut-in Pressure: 1536 PSI Second Initial Flow Pressure: 171 PSI Second Final Flow Pressure: 293 PSI Final Shut-in Pressure: 1520 PSI Final Hydro Pressure: 2646 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 548 ft. Drill Pipe Length: 5026 ft. |
Initial Flow: Weak 1/2"" built to 6"" in 30 mins. Initial Shut-in: No blow back Final Flow: Surface blow built to 5 1/2"" in 60 mins. Final Shut-in: No blow back Remarks: 16 ft. of pay. Recovery 31,000 PPM. |
|
Bottom Hole Temperature: 134 DEG F
Percent Porosity: 9 Samples: None Gas Recovery: Comments: | |
Recovery 590 of Total Fluid 548 of Fluid in Drill Collars 42 of Fluid in Drill Pipe 40 of Mud 100% Mud 240 of Mud cut Water 42% Mud 58% Water 310 of Water 100% Water 31000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5630 to 5656
Formation tested: Chester | Date, Time: 22-APR-99; 03:35:35 |
Initial Hydro Pressure: 2736 PSI
First Initial Flow Pressure: 88 PSI First Final Flow Pressure: 362 PSI Initial Shut-in Pressure: 1490 PSI Second Initial Flow Pressure: 375 PSI Second Final Flow Pressure: 599 PSI Final Shut-in Pressure: 1482 PSI Final Hydro Pressure: 2624 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 548 ft. Drill Pipe Length: 5088 ft. |
Initial Flow: Weak 1"" built to strong off bottom of bucket in 11 mins. Initial Shut-in: No blow back Final Flow: Weak 1/2"" built to strong of bottom of bucket in 13 mins. Final Shut-in: No blow back Remarks: 26 ft. of pay. Bottom packer held. System 3,200 PPM. Recovery 30,000 PPM. |
|
Bottom Hole Temperature: 140 DEG F
Percent Porosity: 12 Samples: None Gas Recovery: Comments: | |
Recovery 1255 of Total Fluid 548 of Fluid in Drill Collars 707 of Fluid in Drill Pipe 60 of Water cut Mud 28% Water 72% Mud 1195 of Water 100% Water 30000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 5335 to 5380
Formation tested: Morrow Lime | Date, Time: 23-APR-99; 00:50:09 |
Initial Hydro Pressure: 2537 PSI
First Initial Flow Pressure: 35 PSI First Final Flow Pressure: 51 PSI Initial Shut-in Pressure: 844 PSI Second Initial Flow Pressure: 57 PSI Second Final Flow Pressure: 58 PSI Final Shut-in Pressure: 343 PSI Final Hydro Pressure: 2516 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 548 ft. Drill Pipe Length: 4772 ft. |
Initial Flow: Weak 1/2"" decrease to a surface blow in 30 mins. Final Flow: No blow Remarks: System 4,800 PPM. Recovery 4,900 PPM. |
|
Bottom Hole Temperature: 122 DEG F
Percent Porosity: Samples: None Gas Recovery: Comments: | |
Recovery 60 of Total Fluid 60 of Fluid in Drill Collars 60 of Mud 100% Mud 4900 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |