API: 15-081-21258
Operator: Harris Oil & Gas Company Field: Eubank South Lease: MLP Rooney 'A' Well 3-5 |
Location: T30S R34W, Sec. 5, NE SE SE
990 North, 385 West, from SE corner Longitude: -101.0540481 Latitude: 37.4631506 County: Haskell Status: D&A |
Spud Date: 26-OCT-99
Completion Date: 07-NOV-99 Plugging Date: 08-NOV-99 Total Depth: 5800 Form. at depth: MISSISSIPPIAN Elevation: 2994 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5427 to 5494
Formation tested: chester | Date, Time: 03-NOV-99; 20:14:24 |
Initial Hydro Pressure: 2704 PSI
First Initial Flow Pressure: 54 PSI First Final Flow Pressure: 139 PSI Initial Shut-in Pressure: 1321 PSI Second Initial Flow Pressure: 153 PSI Second Final Flow Pressure: 271 PSI Final Shut-in Pressure: 1319 PSI Final Hydro Pressure: 2633 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 545 ft. Drill Pipe Length: 4898 ft. |
Initial Flow: 6 1/2"" blow Initial Shut-in: No return Final Flwo: 6"" blow Final Shut-in: No return |
|
Bottom Hole Temperature: 133 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 485 of Total Fluid 485 of Fluid in Drill Collars 60 of Slightly water cut mud 120 of Muddy water 70% water 30% mud 305 of Slightly mud cut water 95% water 5% mud 34000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |