|
API: 15-081-21264
Operator: HELMERICH & PAYNE Field: Pleasant Lease: GOVERNMENT 'B' Well 2 |
Location: T27S R34W, Sec. 12, S2 S2 SW
353 North, 3989 West, from SE corner Longitude: -100.9935825 Latitude: 37.7084544 County: Haskell Status: OIL-P&A |
Spud Date: 06-MAR-00
Completion Date: 11-APR-00 Plugging Date: 09-APR-24 Total Depth: 5350 Form. at depth: MISSISSIPPIAN Elevation: 2967 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4668 to 4707
Formation tested: Marmonton-Pawnee | Date, Time: 12-MAR-00; 11:04:55 |
|
Initial Hydro Pressure: 2209 PSI
First Initial Flow Pressure: 15 PSI First Final Flow Pressure: 52 PSI Initial Shut-in Pressure: 1354 PSI Second Initial Flow Pressure: 62 PSI Second Final Flow Pressure: 146 PSI Final Shut-in Pressure: 1353 PSI Final Hydro Pressure: 2201 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 356 ft. Drill Pipe Length: 4298 ft. |
|
Initial Flow: Weak blow built to 3"" in 15 minutes. Initial Shut-In: No blow back. Final Flow: Weak blow built to 4"" in 60 minutes. Final Shut-In: No blow back. |
|
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 15 Samples: None Gas Recovery: Comments: | |
|
Recovery 235 of Total Fluid 235 of Fluid in Drill Collars 60 of Gas in pipe. 175 of Slightly gas & oil cut mud 60 of Slightly gas cut watery mud 23000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4986 to 5090
Formation tested: Morrow | Date, Time: 14-MAR-00; 06:55:37 |
|
Initial Hydro Pressure: 2388 PSI
First Initial Flow Pressure: PSI First Final Flow Pressure: PSI Initial Shut-in Pressure: PSI Second Initial Flow Pressure: PSI Second Final Flow Pressure: PSI Final Shut-in Pressure: PSI Final Hydro Pressure: 2382 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 356 ft. Drill Pipe Length: 4683 ft. |
| Initial Flow: Packer failure at open. Pulled and reset. Packer failure at open. Pulled tool. | |
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 620 of Total Fluid 356 of Fluid in Drill Collars 264 of Fluid in Drill Pipe 620 of Drilling mud 900 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |