Drill Stem Tests Database
Specific Well--15-097-21451
API: 15-097-21451
Operator:
Field: Nichols
Lease: YOST
Well 1-20
Location: T29S R18W, Sec. 20, N2 SE
2000 North, 1350 West, from SE corner
Longitude: -99.3065091
Latitude: 37.5039038
County: Kiowa
Status: OIL-P&A
Spud Date: 10-JAN-00
Completion Date: 22-JAN-00
Plugging Date: 22-JAN-00
Total Depth: 5008
Form. at depth: MISSISSIPPIAN
Elevation: 2257 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4813 to 4845
Formation tested: Pawnee
Date, Time: 18-JAN-00; 02:33:21
Initial Hydro Pressure: 2379 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 20 PSI
Initial Shut-in Pressure: 1064 PSI
Second Initial Flow Pressure: 17 PSI
Second Final Flow Pressure: 13 PSI
Final Shut-in Pressure: 1087 PSI
Final Hydro Pressure: 2340 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4804 ft.
Initial Flow: Strong blow. Bottom of bucket in 6 minutes. Initial Shut-In: No blow.
Final Flow: Strong blow. Gas to surface in 11 minutes. (see gas volume report.)
Final Shut-In: No blow.
Bottom Hole Temperature: 115 DEG F
Percent Porosity: 10
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Pipe
4789 of Gas in all fluid free pipe.
15 of Drilling mud.
8000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4865 to 4896
Formation tested: Cherokee
Date, Time: 18-JAN-00; 22:25:31
Initial Hydro Pressure: 2417 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 26 PSI
Initial Shut-in Pressure: 528 PSI
Second Initial Flow Pressure: 36 PSI
Second Final Flow Pressure: 25 PSI
Final Shut-in Pressure: 488 PSI
Final Hydro Pressure: 2368 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4865 ft.
Initial Flow: Strong blow. Bottom of bucket in 1 minute. Initial Shut-In: Gas to surface 1 minute in to shut-in No blow.
Final Flow: Strong blow. (see gas volume report)
Final Shut-In: No blow.
Bottom Hole Temperature: 113 DEG F
Percent Porosity: 10
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
35 of Total Fluid
35 of Fluid in Drill Pipe
4830 of Gas in all fluid free pipe.
35 of Drilling mud with a scum of oil.
8000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4912 to 4970
Formation tested: Mississippi
Date, Time: 19-JAN-00; 23:07:17
Initial Hydro Pressure: 2417 PSI
First Initial Flow Pressure: 30 PSI
First Final Flow Pressure: 41 PSI
Initial Shut-in Pressure: 170 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 45 PSI
Final Shut-in Pressure: 170 PSI
Final Hydro Pressure: 2369 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4897 ft.
Initial Flow: Strong blow. Bottom of bucket in 2 1/2 minutes. Gas to surface in 24 minutes. (see gas volume report) Initial Shut-In: Weak 1"" blow.
Final Flow: Strong blow. (see gas volume report)
Final Shut-In: No blow.
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 10
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
63 of Total Fluid
63 of Fluid in Drill Pipe
4834 of Gas in all fluid free pipe.
63 of Drilling mud.
10000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4970 to 4985
Formation tested: Mississippi
Date, Time: 20-JAN-00; 16:31:52
Initial Hydro Pressure: 2453 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 23 PSI
Initial Shut-in Pressure: 234 PSI
Second Initial Flow Pressure: 20 PSI
Second Final Flow Pressure: 27 PSI
Final Shut-in Pressure: 229 PSI
Final Hydro Pressure: 2406 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4958 ft.
Initial Flow: Fair to strong blow. Bottom of bucket in 24 minutes. Initial Shut-In: No blow.
Final Flow: Fair to strong blow. Bottom of bucket in 11 minutes.
Final Shut-In: No blow.
Bottom Hole Temperature: 115 DEG F
Percent Porosity: 12
Samples: None
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Pipe
450 of Gas in pipe.
30 of Gas cut mud.
7000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 4987 to 5008
Formation tested: Mississippi
Date, Time: 21-JAN-00; 13:38:16
Initial Hydro Pressure: 2473 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 32 PSI
Initial Shut-in Pressure: 250 PSI
Second Initial Flow Pressure: 31 PSI
Second Final Flow Pressure: 45 PSI
Final Shut-in Pressure: 239 PSI
Final Hydro Pressure: 2407 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4988 ft.
Initial Flow: Fair to strong blow. Bottom of bucket in 15 minutes. Initial Shut-In: No blow.
Final Flow: Fair to strong blow. Bottom of bucket in 20 minutes.
Final Shut-In: No blow.
Bottom Hole Temperature: 115 DEG F
Percent Porosity: 12
Samples: None
Gas Recovery:
Comments:
Recovery
70 of Total Fluid
70 of Fluid in Drill Pipe
550 of Gas in pipe.
70 of Heavy mud.
7000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.