API: 15-101-21766
Operator: Belport Oil, Inc. Field: Wildcat Lease: Eastin 'A' Well 1 |
Location: T19S R27W, Sec. 18, E2 SW SW
660 North, 990 East, from SW corner Longitude: -100.3518752 Latitude: 38.3954901 County: Lane Status: OIL |
Spud Date: 03-DEC-98
Completion Date: 15-DEC-98 Plugging Date: Total Depth: 4700 Form. at depth: MISSISSIPPIAN Elevation: 2739 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4195 to 4215
Formation tested: KC 160 | Date, Time: 10-DEC-98; 02:48:53 |
Initial Hydro Pressure: 2072 PSI
First Initial Flow Pressure: 18 PSI First Final Flow Pressure: 28 PSI Initial Shut-in Pressure: 1176 PSI Second Initial Flow Pressure: 29 PSI Second Final Flow Pressure: 32 PSI Final Shut-in Pressure: 1169 PSI Final Hydro Pressure: 2002 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 3386 ft. |
Initial Flow: Weak surface blow died in 28 mins. Initial Shut-in: No return Final Flow: Bubble to open tool, no blow Final Shut-in: No return |
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 20 of Total Fluid 20 of Fluid in Drill Pipe 20 of watery mud 70% water 30% mud w/oil scum 27500 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4230 to 4240
Formation tested: KC 180' | Date, Time: 11-DEC-98; 00:54:59 |
Initial Hydro Pressure: 2066 PSI
First Initial Flow Pressure: 25 PSI First Final Flow Pressure: 138 PSI Initial Shut-in Pressure: 718 PSI Second Initial Flow Pressure: 142 PSI Second Final Flow Pressure: 263 PSI Final Shut-in Pressure: 715 PSI Final Hydro Pressure: 2048 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 3417 ft. |
Initial Flow: Bottom of bucket in 15 mins. Initial Shut-in: Bleed off in 1 1/2 min. return in 6 min. built to 1/2""in. Final Flow: Bottom of bucket in 28 mins. Final Shut-in: Bleed off in 1 1/2 mins. return in 5 mins. built to 1/2"" |
|
Bottom Hole Temperature: 132 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 510 of Total Fluid 510 of Fluid in Drill Pipe 30 of clean gassy oil 35% gas 65% oil 180 of gassy slightly oil & water cut mud 30 of gassy oil specked slightly muddy water 48000 of Salinity (PPM) 38 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4260 to 4275
Formation tested: 200 KC | Date, Time: 11-DEC-98; 16:48:42 |
Initial Hydro Pressure: 2094 PSI
First Initial Flow Pressure: 82 PSI First Final Flow Pressure: 399 PSI Initial Shut-in Pressure: 933 PSI Second Initial Flow Pressure: 410 PSI Second Final Flow Pressure: 559 PSI Final Shut-in Pressure: 931 PSI Final Hydro Pressure: 2058 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 3448 ft. |
Initial Flow: Bottom of bucket in 1 min. Initial Shut-in: Bleed off throughout shut in. Final Flow: Bottom of bucket in 1 min. Final Shut-in: Bleed off throughout shut in |
|
Bottom Hole Temperature: 133 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1550 of Total Fluid 1550 of Fluid in Drill Pipe 1430 of clean gassy oil 55%gas 45%oil 120 of gassy heavy oil & water cut mud 41 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 4310 to 4320
Formation tested: 220 KC | Date, Time: 12-DEC-98; 18:07:38 |
Initial Hydro Pressure: 2104 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 21 PSI Initial Shut-in Pressure: 115 PSI Second Initial Flow Pressure: 21 PSI Second Final Flow Pressure: 21 PSI Final Shut-in Pressure: 78 PSI Final Hydro Pressure: 2076 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 3478 ft. |
Initial Flow: Weak surface blow died in 8 mins. Initial Shut-in: No return Final Flow: No blow Final Shut-in: No return |
|
Bottom Hole Temperature: 111 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 1 of Total Fluid 1 of Fluid in Drill Pipe 1 of Drilling mud with oil spots | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 4330 to 4365
Formation tested: Pleasanton | Date, Time: 13-DEC-98; 02:29:14 |
Initial Hydro Pressure: 2136 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 53 PSI Initial Shut-in Pressure: 1137 PSI Second Initial Flow Pressure: 56 PSI Second Final Flow Pressure: 88 PSI Final Shut-in Pressure: 1138 PSI Final Hydro Pressure: 2089 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 3505 ft. |
Initial Flow: Bottom of bucket in 25 mins. Initial Shut-in: No return Final Flow: Bottom of bucket in 11 mins. Final Shut-in: No return |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 150 of Total Fluid 150 of Fluid in Drill Pipe 150 of slightly gassy oil cut mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 6 | Data Source: TRILOBITE |
Interval: 4610 to 4625
Formation tested: miss. | Date, Time: 14-DEC-98; 06:40:47 |
Initial Hydro Pressure: 2304 PSI
First Initial Flow Pressure: 33 PSI First Final Flow Pressure: 185 PSI Initial Shut-in Pressure: 1168 PSI Second Initial Flow Pressure: 194 PSI Second Final Flow Pressure: 346 PSI Final Shut-in Pressure: 1113 PSI Final Hydro Pressure: 2274 PSI |
Tool Data Hole Size: 8.875 in. Drill Collar ID: 2.5 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 90 ft. Drill Pipe Length: 3695 ft. |
I.O.- B.O.B. in 12 min. I.S.I.- Bleed off for 1 1/2 min. weak re turn in 4 min. built to 1/2""in. F.F.- B.O.B. in 20 min. F.S.I.- Bleed off for 2 min. No return | |
Bottom Hole Temperature: 138 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 790 of Total Fluid 90 of Fluid in Drill Collars 700 of Fluid in Drill Pipe 700 of clean gassy oil 25%g 75%o 90 of slitly gassy oil & water cut mud 40 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |