Drill Stem Tests Database
Specific Well--15-101-21776
API: 15-101-21776
Operator: Raymond Oil Co., Inc.
Field: Toni-Mike Northeast
Lease: MAJOR
Well 1
Location: T17S R27W, Sec. 14, SW SE SE
340 North, 1010 West, from SE corner
Longitude: -100.2694006
Latitude: 38.5679609
County: Lane
Status: D&A
Spud Date: 14-JAN-00
Completion Date: 25-JAN-00
Plugging Date: 25-JAN-00
Total Depth: 4616
Form. at depth: MISSISSIPPIAN
Elevation: 2648 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4185 to 4204
Formation tested: KC
Date, Time: 22-JAN-00; 03:55:31
Initial Hydro Pressure: 2105 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 33 PSI
Initial Shut-in Pressure: 560 PSI
Second Initial Flow Pressure: 43 PSI
Second Final Flow Pressure: 53 PSI
Final Shut-in Pressure: 572 PSI
Final Hydro Pressure: 2084 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: ft.
Drill Pipe Length: 3726 ft.
Initial Flow: 1/4"" blow @ open built to 1/2"". Initial Shut-In: No return.
Final Flow: Surface blow in 6 minutes, built to 1/4"".
Final Shut-In: No return.
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
65 of Total Fluid
65 of Fluid in Drill Pipe
5 of Mud cut water
60 of Slightly mud cut water
19500 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4208 to 4236
Formation tested: Kc 200'
Date, Time: 24-JAN-00; 13:28:12
Initial Hydro Pressure: 2186 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 45 PSI
Initial Shut-in Pressure: 778 PSI
Second Initial Flow Pressure: 47 PSI
Second Final Flow Pressure: 64 PSI
Final Shut-in Pressure: 765 PSI
Final Hydro Pressure: 2151 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.5 in.
Drill Collar Length: ft.
Drill Pipe Length: 4104 ft.
Initial Flow: Surface blow built to 2 1/2"" Initial Shutin: no return
Final Flow: Weak surface blow in 15 minutes
Final Shutin: No return
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
80 of Total Fluid
80 of Fluid in Drill Pipe
80 of mud cut water 35%mud 65%water
23000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.