API: 15-101-21776
Operator: Raymond Oil Co., Inc. Field: Toni-Mike Northeast Lease: MAJOR Well 1 |
Location: T17S R27W, Sec. 14, SW SE SE
340 North, 1010 West, from SE corner Longitude: -100.2694006 Latitude: 38.5679609 County: Lane Status: D&A |
Spud Date: 14-JAN-00
Completion Date: 25-JAN-00 Plugging Date: 25-JAN-00 Total Depth: 4616 Form. at depth: MISSISSIPPIAN Elevation: 2648 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 4185 to 4204
Formation tested: KC | Date, Time: 22-JAN-00; 03:55:31 |
Initial Hydro Pressure: 2105 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 33 PSI Initial Shut-in Pressure: 560 PSI Second Initial Flow Pressure: 43 PSI Second Final Flow Pressure: 53 PSI Final Shut-in Pressure: 572 PSI Final Hydro Pressure: 2084 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 3726 ft. |
Initial Flow: 1/4"" blow @ open built to 1/2"". Initial Shut-In: No return. Final Flow: Surface blow in 6 minutes, built to 1/4"". Final Shut-In: No return. |
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 65 of Total Fluid 65 of Fluid in Drill Pipe 5 of Mud cut water 60 of Slightly mud cut water 19500 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4208 to 4236
Formation tested: Kc 200' | Date, Time: 24-JAN-00; 13:28:12 |
Initial Hydro Pressure: 2186 PSI
First Initial Flow Pressure: 19 PSI First Final Flow Pressure: 45 PSI Initial Shut-in Pressure: 778 PSI Second Initial Flow Pressure: 47 PSI Second Final Flow Pressure: 64 PSI Final Shut-in Pressure: 765 PSI Final Hydro Pressure: 2151 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: in. Drill Pipe ID: 3.5 in. Drill Collar Length: ft. Drill Pipe Length: 4104 ft. |
Initial Flow: Surface blow built to 2 1/2"" Initial Shutin: no return Final Flow: Weak surface blow in 15 minutes Final Shutin: No return |
|
Bottom Hole Temperature: 112 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 80 of Total Fluid 80 of Fluid in Drill Pipe 80 of mud cut water 35%mud 65%water 23000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |