Drill Stem Tests Database
Specific Well--15-119-21007
API: 15-119-21007
Operator:
Field:
Lease: Ediger 36
Well 2
Location: T33S R27W, Sec. 36, E2 NE SE
2013 North, 356 West, from SE corner
Longitude: -100.20058
Latitude: 37.131
County: Meade
Status: GAS-P&A
Spud Date: 27-OCT-99
Completion Date: 23-NOV-99
Plugging Date: 15-NOV-07
Total Depth: 6200
Form. at depth: MISSISSIPPIAN
Elevation: 2473 DF
Test Number: 1 Data Source: TRILOBITE
Interval: 5923 to 6206
Formation tested: Chester
Date, Time: 07-NOV-99; 01:41:15
Initial Hydro Pressure: 2945 PSI
First Initial Flow Pressure: 1763 PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2866 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 356.75 ft.
Drill Pipe Length: 5923 ft.
Misrun due to packer failure
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1000 of Total Fluid
356 of Fluid in Drill Collars
6444 of Fluid in Drill Pipe
1000 of mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5854 to 6206
Formation tested: Chester
Date, Time: 07-NOV-99; 15:18:40
Initial Hydro Pressure: 2916 PSI
First Initial Flow Pressure: 85 PSI
First Final Flow Pressure: 99 PSI
Initial Shut-in Pressure: 1853 PSI
Second Initial Flow Pressure: 80 PSI
Second Final Flow Pressure: 126 PSI
Final Shut-in Pressure: 2009 PSI
Final Hydro Pressure: 2829 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 356.75 ft.
Drill Pipe Length: 5825 ft.
Initial Flow: Strong blow bottom of bucket in 1 min. Initial Shut-in: Bled down for 5 mins. no blow back
Final Flow: Strong blow bottom of bucket in 15 secs. gas to surface in 30 secs. gauge gas
Final Shut-in: Bled down for 5 mins.no blow back.
Bottom Hole Temperature: 130 DEG F
Percent Porosity:
Samples: Caraway analytical 728 N.Roosevelt
Gas Recovery:
Comments:
Recovery
376 of Total Fluid
356.25 of Fluid in Drill Collars
20 of Fluid in Drill Pipe
5805 of Gas in pipe
100 of Very slight gas cut mud
276 of Slight gas cut mud 10% gas 90% mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5260 to 5277
Formation tested: Swode
Date, Time: 08-NOV-99; 03:13:00
Initial Hydro Pressure: PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 356 ft.
Drill Pipe Length: 4878 ft.
Misrun hookwall tool wouldnt set.
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.