API: 15-119-21012
Operator: Eagle Creek Corporation Field: Wildcat Lease: FELDMAN Well 1-18 |
Location: T34S R28W, Sec. 18, NW SE SW
849 North, 3371 West, from SE corner Longitude: -100.4093396 Latitude: 37.0850409 County: Meade Status: OIL-P&A |
Spud Date: 11-DEC-99
Completion Date: 31-DEC-99 Plugging Date: 11-MAR-05 Total Depth: 6335 Form. at depth: ST GENEVIEVE Elevation: 2528 KB |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 4903 to 4937
Formation tested: | Date, Time: 22-DEC-99; 07:40:06 |
Initial Hydro Pressure: 2381 PSI
First Initial Flow Pressure: 27 PSI First Final Flow Pressure: 493 PSI Initial Shut-in Pressure: 1287 PSI Second Initial Flow Pressure: 497 PSI Second Final Flow Pressure: 849 PSI Final Shut-in Pressure: 1289 PSI Final Hydro Pressure: 2333 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 355 ft. Drill Pipe Length: 4589 ft. |
Initial Flow: Fair 3"" built to strong blow to bottom of bucket in 2 minutes. Initial Shut-In: Surface blow. Final Flow: Fair blow built to bottom of bucket in 10 minutes. Final Shut-In: No blow back. |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 18 Samples: Gas Recovery: Comments: | |
Recovery 1655 of Total Fluid 355 of Fluid in Drill Collars 1300 of Fluid in Drill Pipe 135 of Water cut mud 1520 of Water 34000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 5873 to 5900
Formation tested: Morrow | Date, Time: 28-DEC-99; 13:53:14 |
Initial Hydro Pressure: 2852 PSI
First Initial Flow Pressure: 37 PSI First Final Flow Pressure: 118 PSI Initial Shut-in Pressure: 1609 PSI Second Initial Flow Pressure: 101 PSI Second Final Flow Pressure: 167 PSI Final Shut-in Pressure: 1650 PSI Final Hydro Pressure: 2815 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 355 ft. Drill Pipe Length: 5499 ft. |
Initial Flow: Fair 2"" blow built to strong blow. Bottom of bucket in 4 minutes. Initial Shut-In: 2 1/2"" blow back. Final Flow: Bottom of bucket immediately. Gas to surface in 17 minutes. see gas flow chart. Final Shut-In: 5 1/2"" blow back. |
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: 20 Samples: None. Gas Recovery: Comments: | |
Recovery 430 of Total Fluid 355 of Fluid in Drill Collars 75 of Fluid in Drill Pipe 80 of Gassy mud cut oil 345 of Gassy mud cut oil 5 of Oil & gas cut filtrate water 21 of Gravity (API) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |