Drill Stem Tests Database
Specific Well--15-119-21012
API: 15-119-21012
Operator: Eagle Creek Corporation
Field: Wildcat
Lease: FELDMAN
Well 1-18
Location: T34S R28W, Sec. 18, NW SE SW
849 North, 3371 West, from SE corner
Longitude: -100.4093396
Latitude: 37.0850409
County: Meade
Status: OIL-P&A
Spud Date: 11-DEC-99
Completion Date: 31-DEC-99
Plugging Date: 11-MAR-05
Total Depth: 6335
Form. at depth: ST GENEVIEVE
Elevation: 2528 KB
Test Number: 2 Data Source: TRILOBITE
Interval: 4903 to 4937
Formation tested:
Date, Time: 22-DEC-99; 07:40:06
Initial Hydro Pressure: 2381 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 493 PSI
Initial Shut-in Pressure: 1287 PSI
Second Initial Flow Pressure: 497 PSI
Second Final Flow Pressure: 849 PSI
Final Shut-in Pressure: 1289 PSI
Final Hydro Pressure: 2333 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 355 ft.
Drill Pipe Length: 4589 ft.
Initial Flow: Fair 3"" built to strong blow to bottom of bucket in 2 minutes. Initial Shut-In: Surface blow.
Final Flow: Fair blow built to bottom of bucket in 10 minutes.
Final Shut-In: No blow back.
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 18
Samples:
Gas Recovery:
Comments:
Recovery
1655 of Total Fluid
355 of Fluid in Drill Collars
1300 of Fluid in Drill Pipe
135 of Water cut mud
1520 of Water
34000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5873 to 5900
Formation tested: Morrow
Date, Time: 28-DEC-99; 13:53:14
Initial Hydro Pressure: 2852 PSI
First Initial Flow Pressure: 37 PSI
First Final Flow Pressure: 118 PSI
Initial Shut-in Pressure: 1609 PSI
Second Initial Flow Pressure: 101 PSI
Second Final Flow Pressure: 167 PSI
Final Shut-in Pressure: 1650 PSI
Final Hydro Pressure: 2815 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 355 ft.
Drill Pipe Length: 5499 ft.
Initial Flow: Fair 2"" blow built to strong blow. Bottom of bucket in 4 minutes. Initial Shut-In: 2 1/2"" blow back.
Final Flow: Bottom of bucket immediately. Gas to surface in 17 minutes. see gas flow chart.
Final Shut-In: 5 1/2"" blow back.
Bottom Hole Temperature: 128 DEG F
Percent Porosity: 20
Samples: None.
Gas Recovery:
Comments:
Recovery
430 of Total Fluid
355 of Fluid in Drill Collars
75 of Fluid in Drill Pipe
80 of Gassy mud cut oil
345 of Gassy mud cut oil
5 of Oil & gas cut filtrate water
21 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.