Drill Stem Tests Database
Specific Well--15-119-21015
API: 15-119-21015
Operator: PICKRELL DRILLING COMPANY, INC.
Field: Wildcat
Lease: Hayden 'B'
Well 1
Location: T32S R30W, Sec. 30, S2 SE NE
2310 South, 660 West, from NE corner
Longitude: -100.6187075
Latitude: 37.2362166
County: Meade
Status: D&A
Spud Date: 05-JAN-00
Completion Date: 19-JAN-00
Plugging Date: 19-JAN-00
Total Depth: 5860
Form. at depth: MISSISSIPPIAN
Elevation: 2767 KB

Download DST Test Data

Test Number: 3 Data Source: TRILOBITE
Interval: 5772 to 5866
Formation tested: Chester
Date, Time: 18-JAN-00; 13:49:17
Initial Hydro Pressure: 2862 PSI
First Initial Flow Pressure: 36 PSI
First Final Flow Pressure: 44 PSI
Initial Shut-in Pressure: 76 PSI
Second Initial Flow Pressure: 34 PSI
Second Final Flow Pressure: 40 PSI
Final Shut-in Pressure: 1053 PSI
Final Hydro Pressure: 2819 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 235 ft.
Drill Pipe Length: 5605 ft.
Initial Flow: Strong blow bottom of bucket in 35 seconds. Initial Shut-In: Bled 2 1/2"". Blow back never died.
Final Flow: Fair blow. Bottom of bucket in 20 minutes. Built to strong blow in 40 minutes.
Final Shut-In: Bled 2"". No blow back.
Bottom Hole Temperature: 120 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
70 of Total Fluid
70 of Fluid in Drill Collars
70 of Mud
View Pressures No Recovery Gas data.