Drill Stem Tests Database
Specific Well--15-187-20924
API: 15-187-20924
Operator: McCoy Petroleum Corp.
Field: Beauchamp
Lease: Hoffman 'A'
Well 1-25
Location: T30S R41W, Sec. 25, W2 SE SE SW
330 North, 2278 East, from SW corner
Longitude: -101.7542881
Latitude: 37.4040481
County: Stanton
Status: O&G-P&A
Spud Date: 08-NOV-99
Completion Date: 08-JAN-00
Plugging Date: 20-DEC-13
Total Depth: 5670
Form. at depth: MISSISSIPPIAN
Elevation: 3366 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5243 to 5260
Formation tested: lower morrow
Date, Time: 18-NOV-99; 17:19:46
Initial Hydro Pressure: 2517 PSI
First Initial Flow Pressure: 10 PSI
First Final Flow Pressure: 18 PSI
Initial Shut-in Pressure: 44 PSI
Second Initial Flow Pressure: 13 PSI
Second Final Flow Pressure: 17 PSI
Final Shut-in Pressure: 36 PSI
Final Hydro Pressure: 2505 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.23 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 238 ft.
Drill Pipe Length: 4991 ft.
Initial Flow: Weak 1/4"" surface blow died in 10 mins. Initial Shut-in: No blow back
Final Flow: No blow
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
1 of Total Fluid
1 of Fluid in Drill Collars
1 of Mud 100%
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5327 to 5365
Formation tested: Lower Morrow
Date, Time: 20-NOV-99; 04:43:02
Initial Hydro Pressure: 2563 PSI
First Initial Flow Pressure: 31 PSI
First Final Flow Pressure: 29 PSI
Initial Shut-in Pressure: 79 PSI
Second Initial Flow Pressure: 26 PSI
Second Final Flow Pressure: 33 PSI
Final Shut-in Pressure: 147 PSI
Final Hydro Pressure: 2533 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 238 ft.
Drill Pipe Length: 5084 ft.
Initial Flow: Weak 1/8"" surface blow died back to 1/16"" Initial Shut-in: No blow back
Final Flow: Weak surface blow died in 15 mins.
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
10 of Total Fluid
10 of Fluid in Drill Collars
10 of Mud 100%
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5380 to 5415
Formation tested: Lower Morrow
Date, Time: 21-NOV-99; 22:59:07
Initial Hydro Pressure: 2579 PSI
First Initial Flow Pressure: 75 PSI
First Final Flow Pressure: 75 PSI
Initial Shut-in Pressure: 1155 PSI
Second Initial Flow Pressure: 99 PSI
Second Final Flow Pressure: 75 PSI
Final Shut-in Pressure: 1148 PSI
Final Hydro Pressure: 2541 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 238 ft.
Drill Pipe Length: 5145 ft.
1st open B.O.B. in 30 sec. GTS in 15 min gas will burn no blow back 2nd open .O.B. as soon as tool opened no blow back
Bottom Hole Temperature: 130 DEG F
Percent Porosity:
Samples: yes
Gas Recovery:
Comments:
Recovery
270 of Total Fluid
238 of Fluid in Drill Collars
32 of Fluid in Drill Pipe
90 of Oil cut gassy mud 10% Gas 2% Oil 88% Mud
120 of Gassy oil cut mud 20% Gas 5% Oil 75% Mud
60 of Gassy muddy oil 75% Gas 10% Oil 15% Mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 5415 to 54300
Formation tested: Morrow & Mississippi
Date, Time: 21-NOV-99; 17:34:21
Initial Hydro Pressure: 2590 PSI
First Initial Flow Pressure: 25 PSI
First Final Flow Pressure: 53 PSI
Initial Shut-in Pressure: 1178 PSI
Second Initial Flow Pressure: 35 PSI
Second Final Flow Pressure: 120 PSI
Final Shut-in Pressure: 1180 PSI
Final Hydro Pressure: 2528 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 238 ft.
Drill Pipe Length: 5176 ft.
Initial Flow: Strong blow bottom of bucket in 3 mins. Initial Shut-in: No blow back
Final Flow: Bottom of bucket in 40 secs. strong blow
Final Shut-in: No blow back
Bottom Hole Temperature: DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
328 of Total Fluid
238 of Fluid in Drill Collars
90 of Fluid in Drill Pipe
60 of Gas cut oil 10% Gas 90% Oil
208 of Gassy oily mud 40% Gas 20% Oil 40% Mud
60 of Oil cut gassy mud 10% Gas 10% Oil 80% Mud
48 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.