Drill Stem Tests Database
Specific Well--15-189-22330
API: 15-189-22330
Operator: OXY USA INC
Field: Kinsler
Lease: MLP Close 'A'
Well 1
Location: T31S R39W, Sec. 34, NE SW
1917 North, 3262 West, from SE corner
Longitude: -101.5489076
Latitude: 37.306375
County: Stevens
Status: OIL
Spud Date: 06-FEB-00
Completion Date: 23-MAY-00
Plugging Date:
Total Depth: 6004
Form. at depth: MORROW
Elevation: 3241 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5453 to 5523
Formation tested: Morrow Sand
Date, Time: 14-FEB-00; 10:28:09
Initial Hydro Pressure: 2585 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 22 PSI
Initial Shut-in Pressure: 184 PSI
Second Initial Flow Pressure: 21 PSI
Second Final Flow Pressure: 22 PSI
Final Shut-in Pressure: 182 PSI
Final Hydro Pressure: 2562 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 608 ft.
Drill Pipe Length: 4827 ft.
Initial Flow: Strong blow. Bottom of bucket in 1 minute. Decreased to weak 2"" blow in 30 minutes. Initial Shut-In: No blow back.
Final Flow: Strong blow. Bottom of bucket immediately. Decreased to 1/4"" blow in 30 minutes.
Final Shut-In: No blow back.
Bottom Hole Temperature: 126 DEG F
Percent Porosity: 5
Samples: NONE
Gas Recovery:
Comments:
Recovery
60 of Total Fluid
60 of Fluid in Drill Collars
829 of Gas in pipe
60 of Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.