Drill Stem Tests Database
Specific Well--15-191-22343
API: 15-191-22343
Operator: NOBLE PETROLEUM
Field: Wildcat
Lease: Burkhart 'B'
Well 1
Location: T34S R1W, Sec. 14, SE NE SE SW
782 North, 2896 West, from SE corner
Longitude: -97.392515
Latitude: 37.0881239
County: Sumner
Status: OIL
Spud Date: 29-JAN-00
Completion Date: 16-FEB-00
Plugging Date:
Total Depth: 4000
Form. at depth: ARBUCKLE
Elevation: 1169 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 3914 to 3948
Formation tested: Mississippi
Date, Time: 10-FEB-00; 16:53:32
Initial Hydro Pressure: 1915 PSI
First Initial Flow Pressure: 23 PSI
First Final Flow Pressure: 43 PSI
Initial Shut-in Pressure: 1488 PSI
Second Initial Flow Pressure: 47 PSI
Second Final Flow Pressure: 66 PSI
Final Shut-in Pressure: 1462 PSI
Final Hydro Pressure: 1873 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3904 ft.
Initial Flow: Weak blow built to bottom of bucket in 22 minutes. Initial Shut-In: Bled down for 2 minutes. Very slight surface blow back.
Final Flow: Fair blow built to bottom of bucket in 1 minute.
Final Shut-In: Bled down for 5 minutes. No blow back
Bottom Hole Temperature: 125 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
100 of Total Fluid
100 of Fluid in Drill Pipe
1140 of Gas in pipe.
40 of Gas cut oily mud
60 of Gas & oil cut mud
View Pressures No Recovery Gas data.