|
API: 15-193-20668
Operator: SLAWSON EXPLORATION COMPANY INC Field: Wildcat Lease: Park College Well 1 |
Location: T10S R32W, Sec. 7, NW SE
2010 North, 2010 West, from SE corner Longitude: -100.932673 Latitude: 39.1967272 County: Thomas Status: D&A |
Spud Date: 26-NOV-99
Completion Date: 05-DEC-99 Plugging Date: 05-DEC-99 Total Depth: 4700 Form. at depth: MISSISSIPPIAN Elevation: 3086 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4124 to 4156
Formation tested: Lansing | Date, Time: 01-DEC-99; 09:57:23 |
|
Initial Hydro Pressure: 1976 PSI
First Initial Flow Pressure: 107 PSI First Final Flow Pressure: 636 PSI Initial Shut-in Pressure: 1257 PSI Second Initial Flow Pressure: 650 PSI Second Final Flow Pressure: 1026 PSI Final Shut-in Pressure: 1258 PSI Final Hydro Pressure: 1912 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 232 ft. Drill Pipe Length: 3880 ft. |
|
Initial Flow: Strong--bottom of bucket in 90 seconds Initial Shut-in: No blow Final Flow- Strong-- bottom of bucket in 4 minutes Final Shut-in: No blow |
|
|
Bottom Hole Temperature: 128 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2325 of Total Fluid 232 of Fluid in Drill Collars 2093 of Fluid in Drill Pipe 480 of Muddy water 70% water 30% mud 1845 of salt water 44000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4252 to 4290
Formation tested: Swope | Date, Time: 02-DEC-99; 13:00:59 |
|
Initial Hydro Pressure: 2064 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 119 PSI Initial Shut-in Pressure: 1218 PSI Second Initial Flow Pressure: 122 PSI Second Final Flow Pressure: 180 PSI Final Shut-in Pressure: 1223 PSI Final Hydro Pressure: 2042 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 232 ft. Drill Pipe Length: 4011 ft. |
|
Initial Flow: Weak 3/4"" blow building to 7.5"" seconds Initial Shut-in: No blow Final Flow: Surface blow building to 8.5"" minutes Final Shut-in: No blow |
|
|
Bottom Hole Temperature: 125 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 360 of Total Fluid 232 of Fluid in Drill Collars 128 of Fluid in Drill Pipe 5 of Clean oil 105 of Muddy water 60% water 40% mud 250 of Muddy water 80% water 20% mud 52000 of Salinity (PPM) 28 of Gravity (API) | |
| View Pressures | View Recovery Gas |