Drill Stem Tests Database
Specific Well--15-009-24669
API: 15-009-24669
Operator: American Warrior, Inc.
Field: Kraft-Prusa
Lease: BROWN 'A'
Well 1
Location: T17S R11W, Sec. 10, NW SE SE
875 North, 875 West, from SE corner
Longitude: -98.51967
Latitude: 38.582297
County: Barton
Status: OIL
Spud Date: 03/27/2000
Completion Date: 04/02/2000
Plugging Date:
Total Depth: 3295
Form. at depth: ARBUCKLE
Elevation: 1864 KB
E-logs mismarked 875' FWL, should be FEL. (SPL 5-20-02)

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 3180 to 3202
Formation tested: LKC J
Date, Time: 03/21/2000; 09:30:47
Initial Hydro Pressure: 1555 PSI
First Initial Flow Pressure: 12 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 331 PSI
Second Initial Flow Pressure: 15 PSI
Second Final Flow Pressure: 25 PSI
Final Shut-in Pressure: 339 PSI
Final Hydro Pressure: 1516 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 3147 ft.
Initial Flow: Weak 1/8"" blow building to 7.5"". Initial Shut-In: Weak surface blow.
Final Flow: 7"" blow building to bottom of bucket in 16 minutes.
Final Shut-In: No blow.
Bottom Hole Temperature: 102 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Collars
210 of Gas in pipe.
30 of Heavy oil cut mud
View Pressures No Recovery Gas data.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 3180 to 3202
Formation tested: LKC J
Date, Time: 04/01/2000; 03:31:26
Initial Hydro Pressure: 1555 PSI
First Initial Flow Pressure: 12 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 331 PSI
Second Initial Flow Pressure: 15 PSI
Second Final Flow Pressure: 25 PSI
Final Shut-in Pressure: 339 PSI
Final Hydro Pressure: 1516 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 30 ft.
Drill Pipe Length: 3147 ft.
Initial Flow: Weak 1/8"" blow building to 7.5"". Initial Shut-In: Weak surface blow.
Final Flow: 7"" blow building to bottom of bucket in 16 minutes.
Final Shut-In: No blow.
Bottom Hole Temperature: 102 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
30 of Total Fluid
30 of Fluid in Drill Collars
210 of Gas in pipe.
30 of Heavy oil cut mud
View Pressures No Recovery Gas data.