|
API: 15-009-24669
Operator: American Warrior, Inc. Field: Kraft-Prusa Lease: BROWN 'A' Well 1 |
Location: T17S R11W, Sec. 10, NW SE SE
875 North, 875 West, from SE corner Longitude: -98.51967 Latitude: 38.582297 County: Barton Status: OIL |
Spud Date: 03/27/2000
Completion Date: 04/02/2000 Plugging Date: Total Depth: 3295 Form. at depth: ARBUCKLE Elevation: 1864 KB |
| E-logs mismarked 875' FWL, should be FEL. (SPL 5-20-02) | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3180 to 3202
Formation tested: LKC J | Date, Time: 03/21/2000; 09:30:47 |
|
Initial Hydro Pressure: 1555 PSI
First Initial Flow Pressure: 12 PSI First Final Flow Pressure: 21 PSI Initial Shut-in Pressure: 331 PSI Second Initial Flow Pressure: 15 PSI Second Final Flow Pressure: 25 PSI Final Shut-in Pressure: 339 PSI Final Hydro Pressure: 1516 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 3147 ft. |
|
Initial Flow: Weak 1/8"" blow building to 7.5"". Initial Shut-In: Weak surface blow. Final Flow: 7"" blow building to bottom of bucket in 16 minutes. Final Shut-In: No blow. |
|
|
Bottom Hole Temperature: 102 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 210 of Gas in pipe. 30 of Heavy oil cut mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3180 to 3202
Formation tested: LKC J | Date, Time: 04/01/2000; 03:31:26 |
|
Initial Hydro Pressure: 1555 PSI
First Initial Flow Pressure: 12 PSI First Final Flow Pressure: 21 PSI Initial Shut-in Pressure: 331 PSI Second Initial Flow Pressure: 15 PSI Second Final Flow Pressure: 25 PSI Final Shut-in Pressure: 339 PSI Final Hydro Pressure: 1516 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 3147 ft. |
|
Initial Flow: Weak 1/8"" blow building to 7.5"". Initial Shut-In: Weak surface blow. Final Flow: 7"" blow building to bottom of bucket in 16 minutes. Final Shut-In: No blow. |
|
|
Bottom Hole Temperature: 102 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 210 of Gas in pipe. 30 of Heavy oil cut mud | |
| View Pressures | No Recovery Gas data. |