Drill Stem Tests Database
Specific Well--15-033-21061
API: 15-033-21061
Operator: Samuel Gary Jr. and Assoc., Inc.
Field: Wildcat
Lease: Selzer
Well 26-13
Location: T33S R19W, Sec. 26, E2 SW SW
580 North, 1010 East, from SW corner
Longitude: -99.3580587
Latitude: 37.1364729
County: Comanche
Status: D&A
Spud Date: 01-FEB-00
Completion Date: 16-FEB-00
Plugging Date: 16-FEB-00
Total Depth: 6550
Form. at depth: ARBUCKLE
Elevation: 1943 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5135 to 5189
Formation tested: Pawnee-Ft.Scott
Date, Time: 09-FEB-00; 02:21:30
Initial Hydro Pressure: 2532 PSI
First Initial Flow Pressure: 85 PSI
First Final Flow Pressure: 134 PSI
Initial Shut-in Pressure: 1906 PSI
Second Initial Flow Pressure: 163 PSI
Second Final Flow Pressure: 285 PSI
Final Shut-in Pressure: 1861 PSI
Final Hydro Pressure: 2493 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 294.56 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow. Bottom of bucket in 30 seconds. Initial Shut-In: Bled down for 5 minutes. Built back to 1/4"" in water bucket.
Final Flow: Strong blow. Bottom of bucket in 90 seconds. Gas to surface in 55 minutes Gauged gas.
Final Flow: Bled down for 20 minutes. Slight blow 1/4"" in water bucket.
Bottom Hole Temperature: 126 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
578 of Total Fluid
294 of Fluid in Drill Collars
284 of Fluid in Drill Pipe
4526 of Gas in pipe
120 of Slightly gas cut mud
200 of Gas cut muddy water
258 of Gas & mud cut water
60000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 6088 to 6142
Formation tested: Viola
Date, Time: 13-FEB-00; 03:18:40
Initial Hydro Pressure: 3017 PSI
First Initial Flow Pressure: 25 PSI
First Final Flow Pressure: 29 PSI
Initial Shut-in Pressure: 1245 PSI
Second Initial Flow Pressure: 25 PSI
Second Final Flow Pressure: 33 PSI
Final Shut-in Pressure: 806 PSI
Final Hydro Pressure: 2956 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 294.56 ft.
Drill Pipe Length: ft.
Initial Flow: Weak blow built to 2"" in water bucket. Initial Shut-In: Bled down for 2 minutes. No blow back
Final Flow: Fair blow built to 3"" in water bucket died in 5 minutes.
Final Shut-In: Dead blow.
Bottom Hole Temperature: 131 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
120 of Gas in pipe
20 of Very slightly gas cut mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.