|
API: 15-033-21068
Operator: CRAWFORD OIL & GAS ENERGIES, INC. Field: Buttermilk Northeast Lease: Hoffman Trust Well 1 |
Location: T34S R18W, Sec. 8, SW NW NW NW
4910 North, 4977 West, from SE corner Longitude: -99.3055539 Latitude: 37.1048423 County: Comanche Status: OIL-P&A |
Spud Date: 17-FEB-00
Completion Date: 10-MAY-00 Plugging Date: 24-SEP-19 Total Depth: 6200 Form. at depth: VIOLA Elevation: 1905 KB |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 6290 to 6315
Formation tested: Simpson | Date, Time: 01-MAR-00; 16:14:10 |
|
Initial Hydro Pressure: 3008 PSI
First Initial Flow Pressure: 253 PSI First Final Flow Pressure: 965 PSI Initial Shut-in Pressure: 2408 PSI Second Initial Flow Pressure: 992 PSI Second Final Flow Pressure: 1839 PSI Final Shut-in Pressure: 2407 PSI Final Hydro Pressure: 2962 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 295 ft. Drill Pipe Length: 5977 ft. |
|
Initial Flow: Strong bottom of bucket in 2 minutes. Cracked 2"". Decreased slightly in 30 minutes. Initial Shut-In: Strong bottom of bucket blow back. Final Flow: Strong bottom of bucket in 2 minutes. Strong throughout. Final Shut-In: 8"" blow back. Remarks: Est. 13 Ft. of pay. Pit chlori- des 5,400 PPM. RW 0.18 Ohms at 45 F. 66,500 PPM. |
|
|
Bottom Hole Temperature: 147 DEG F
Percent Porosity: 20 Samples: None Gas Recovery: Comments: | |
|
Recovery 3720 of Total Fluid 295 of Fluid in Drill Collars 3425 of Fluid in Drill Pipe 3720 of Gassy Water 66500 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4925 to 4994
Formation tested: Hertha | Date, Time: 25-FEB-00; 00:55:26 |
|
Initial Hydro Pressure: 2496 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 23 PSI Initial Shut-in Pressure: 68 PSI Second Initial Flow Pressure: 30 PSI Second Final Flow Pressure: 32 PSI Final Shut-in Pressure: 35 PSI Final Hydro Pressure: 2349 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 295.42 ft. Drill Pipe Length: ft. |
|
Initial Flow: Weak surface blow built to 1/4""-1/2"" in water bucket. Initial Shut-In: Bled down for 1 minute. No blow back. Final Flow: Dead blow. Final Shut-In: Dead blow. |
|
|
Bottom Hole Temperature: 114 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2 of Total Fluid 2 of Fluid in Drill Collars 2 of Very slightly gas cut mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 6087 to 6150
Formation tested: Viola | Date, Time: 18-MAY-00; 14:45:45 |
|
Initial Hydro Pressure: 3053 PSI
First Initial Flow Pressure: 24 PSI First Final Flow Pressure: 21 PSI Initial Shut-in Pressure: 188 PSI Second Initial Flow Pressure: 18 PSI Second Final Flow Pressure: 25 PSI Final Shut-in Pressure: 388 PSI Final Hydro Pressure: 2943 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 120 ft. Drill Pipe Length: 5947 ft. |
|
Initial Flow: Weak bow. Slow increase to 3"". Initial Shut-In: No blow. Final Flow: Fair blow. 4 - 8"". Final Shut-In: No blow. |
|
|
Bottom Hole Temperature: 131 DEG F
Percent Porosity: 10 Samples: none Gas Recovery: Comments: | |
|
Recovery 20 of Total Fluid 20 of Fluid in Drill Collars 100 of Gas in pipe. 20 of Drilling mud 6000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |