Drill Stem Tests Database
Specific Well--15-033-21070
API: 15-033-21070
Operator: DAYSTAR PETROLEUM, INC.
Field: Lemon Ranch Southeast
Lease: Hackney 'B'
Well 1-17
Location: T34S R19W, Sec. 17, SE NE NE SW
2249 North, 2946 West, from SE corner
Longitude: -99.4072144
Latitude: 37.0826907
County: Comanche
Status: O&G-P&A
Spud Date: 06-MAR-00
Completion Date: 18-MAY-00
Plugging Date: 12-MAY-17
Total Depth: 6254
Form. at depth: MISSISSIPPIAN
Elevation: 1799 KB
Discovery well for Lemon Ranch Southeast field.

Download DST Test Data

Test Number: 4 Data Source: TRILOBITE
Interval: 5240 to 5264
Formation tested: Mississippi
Date, Time: 18-MAR-00; 12:17:13
Initial Hydro Pressure: 2604 PSI
First Initial Flow Pressure: 19 PSI
First Final Flow Pressure: 24 PSI
Initial Shut-in Pressure: 369 PSI
Second Initial Flow Pressure: 19 PSI
Second Final Flow Pressure: 31 PSI
Final Shut-in Pressure: 923 PSI
Final Hydro Pressure: 2492 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 236 ft.
Drill Pipe Length: 5011 ft.
Initial Flow: Fair to strong blow. Bottom of bucket in 10 minutes. Initial Shut-In: No blow.
Final Flow: Strong blow. Bottom of bucket in 7 minutes.
Final Shut-In: No blow.
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 10
Samples: none
Gas Recovery:
Comments:
Recovery
80 of Total Fluid
80 of Fluid in Drill Collars
80 of Heavy mud.
5000 of Salinity (PPM)
View Pressures No Recovery Gas data.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 4828 to 4836
Formation tested: Swope/K.C.
Date, Time: 14-MAR-00; 18:25:56
Initial Hydro Pressure: 2459 PSI
First Initial Flow Pressure: 24 PSI
First Final Flow Pressure: 42 PSI
Initial Shut-in Pressure: 1439 PSI
Second Initial Flow Pressure: 29 PSI
Second Final Flow Pressure: 83 PSI
Final Shut-in Pressure: 1292 PSI
Final Hydro Pressure: 2390 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 232.02 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow. Bottom of bucket in 20 seconds. Initial Shut-In: Bled down for 5 minutes. No blow back.
Final Flow: Strong blow bottom of bucket in 10 seconds. Gas to surface in 2 1/2 minutes. Gauge gas.
Final Shut-In: Bled down for 5 minutes. Very slight surface blow back.
Bottom Hole Temperature: 116 DEG F
Percent Porosity:
Samples: Caraway Analytical
Gas Recovery:
Comments:
Recovery
232 of Total Fluid
232 of Fluid in Drill Collars
4585 of Gas in pipe.
60 of Free oil, Slightly gas cut
120 of Gas & oil cut mud Trace of water
52 of Heavily gas cut oily mud
41 of Gravity (API)
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5047 to 5110
Formation tested: Pawnee/Ft.Scott
Date, Time: 16-MAR-00; 11:41:20
Initial Hydro Pressure: 2528 PSI
First Initial Flow Pressure: 131 PSI
First Final Flow Pressure: 168 PSI
Initial Shut-in Pressure: 1971 PSI
Second Initial Flow Pressure: 170 PSI
Second Final Flow Pressure: 214 PSI
Final Shut-in Pressure: 1962 PSI
Final Hydro Pressure: 2447 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 232.02 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow. Bottom of bucket in 15 seconds. Gas to surface in 3 minutes. Gauged gas. Initial Shut-In: Bled down for 30 minutes. No blow back.
Final Flow: Strong blow bottom of bucket in 10 seconds. Gauged gas.
Final Shut-In: Bled down for 60 minutes. Built back to weak surface bow 1 1/4"" in diesel bucket.
Bottom Hole Temperature: 113 DEG F
Percent Porosity:
Samples: Carawaay Analytical,728 N.Roosevelt
Gas Recovery:
Comments:
Recovery
640 of Total Fluid
232 of Fluid in Drill Collars
408 of Fluid in Drill Pipe
4393 of Gas in pipe.
220 of Slightly gas & oil cut mud
240 of Slightly oil & gas cut muddy water
180 of Slightly oil & condensate cut muddy water
75000 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5147 to 5235
Formation tested: Detrital/Miss
Date, Time: 17-MAR-00; 16:07:49
Initial Hydro Pressure: 2532 PSI
First Initial Flow Pressure: 50 PSI
First Final Flow Pressure: 57 PSI
Initial Shut-in Pressure: 1087 PSI
Second Initial Flow Pressure: 66 PSI
Second Final Flow Pressure: 83 PSI
Final Shut-in Pressure: 1201 PSI
Final Hydro Pressure: 2405 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 236 ft.
Drill Pipe Length: 4888 ft.
Initial Flow: Strong blow. Bottom of bucket in 1 1/2 minutes. Initial Shut-In: No blow.
Final Flow: Strong blow. Gas to surface in 7 minutes. (See gas volume report)
Final Shut-In: No blow.
Bottom Hole Temperature: 125 DEG F
Percent Porosity: 10
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
175 of Total Fluid
175 of Fluid in Drill Collars
175 of Heavy mud
5000 of Salinity (PPM)
View Pressures View Recovery Gas