Drill Stem Tests Database
Specific Well--15-095-21761
API: 15-095-21761
Operator: Graves Drilling Co., Inc.
Field: Wildcat
Lease: GOWIN
Well 1
Location: T28S R5W, Sec. 13, NW NW NW
330 South, 555 East, from NW corner
Longitude: -97.8242898
Latitude: 37.6175951
County: Kingman
Status: D&A
Spud Date: 19-FEB-00
Completion Date: 26-FEB-00
Plugging Date: 26-FEB-00
Total Depth: 3870
Form. at depth: MISSISSIPPIAN
Elevation: 1393 KB
Test Number: 2 Data Source: TRILOBITE
Interval: 3780 to 3820
Formation tested: Mississippi
Date, Time: 25-FEB-00; 18:49:13
Initial Hydro Pressure: 1769 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 37 PSI
Initial Shut-in Pressure: 887 PSI
Second Initial Flow Pressure: 43 PSI
Second Final Flow Pressure: 65 PSI
Final Shut-in Pressure: 812 PSI
Final Hydro Pressure: 1742 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3778 ft.
Initial Flow: Strong blow. Bottom of bucket in 4 1/2 minutes. Initial Shut-In: No blow.
Final Flow: Strong blow. Bottom of bucket immediately.
Final Shut-In: No blow.
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
110 of Total Fluid
110 of Fluid in Drill Pipe
1500 of Gas in pipe. (approx.)
60 of Gas & oil cut watery mud
50 of Slightly oil cut muddy water
88000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 3764 to 3780
Formation tested: Mississippi
Date, Time: 25-FEB-00; 00:17:29
Initial Hydro Pressure: 1779 PSI
First Initial Flow Pressure: 106 PSI
First Final Flow Pressure: 39 PSI
Initial Shut-in Pressure: 837 PSI
Second Initial Flow Pressure: 25 PSI
Second Final Flow Pressure: 35 PSI
Final Shut-in Pressure: 835 PSI
Final Hydro Pressure: 1736 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3748 ft.
Initial Flow: Strong blow to bottom of bucket in 5 minutes. Initial Shut-In: No blow.
Final Flow: Strong blow. Bottom of bucket immediately.
Final Shut-In: No blow.
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
65 of Total Fluid
65 of Fluid in Drill Pipe
3120 of Gas in pipe.
65 of Slightly oil cut mud
8000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.