API: 15-101-21777
Operator: Mull Drilling Co., Inc. Field: Shields Lease: GRAEFF Well 2 |
Location: T17S R28W, Sec. 9, W2 NE NW
660 South, 1650 East, from NW corner Longitude: -100.4263426 Latitude: 38.5955943 County: Lane Status: OIL |
Spud Date: 15-FEB-00
Completion Date: 14-MAR-00 Plugging Date: Total Depth: 4590 Form. at depth: MISSISSIPPIAN Elevation: 2774 KB |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 4190 to 4226
Formation tested: J | Date, Time: 22-FEB-00; 03:20:16 |
Initial Hydro Pressure: 2039 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 39 PSI Initial Shut-in Pressure: 1094 PSI Second Initial Flow Pressure: 43 PSI Second Final Flow Pressure: 59 PSI Final Shut-in Pressure: 1092 PSI Final Hydro Pressure: 2030 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4158 ft. |
Intitial Flow: 1/4"" @ open built to 2 1/2"". Initial Shut-In: No return. Final Flow: 1/2"" @ open built to bottom of bucket in 48 minutes. Final Shut-In: Bled off for 2 minutes. Weak surface return in 4 minutes. Died in 35 minutes. |
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 105 of Total Fluid 30 of Fluid in Drill Collars 75 of Fluid in Drill Pipe 135 of Gas in pipe. 45 of Slightly gassy oil cut mud 60 of Gassy mud cut oil | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 4227 to 4249
Formation tested: K | Date, Time: 22-FEB-00; 17:12:49 |
Initial Hydro Pressure: 2051 PSI
First Initial Flow Pressure: 61 PSI First Final Flow Pressure: 124 PSI Initial Shut-in Pressure: 998 PSI Second Initial Flow Pressure: 146 PSI Second Final Flow Pressure: 364 PSI Final Shut-in Pressure: 992 PSI Final Hydro Pressure: 2039 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4192 ft. |
Initial Flow: Bottom of bucket in 1 1/2minutes. Initial Shut-In: Bled off 5 minutes. Return in 1/2 minute. Bottom of bucket in 8 minutes Final Flow: Bottom of bucket @ open. Final Shut-In: Bled off 3 minutes. Return in 1 minute. Bottom of bucket in 90 minutes. |
|
Bottom Hole Temperature: 126 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 930 of Total Fluid 30 of Fluid in Drill Collars 900 of Fluid in Drill Pipe 2670 of Gas in pipe. 690 of Clean gassy oil 120 of Mud cut gassy oil 120 of Mud cut gassy water with trace of oil 30 of Gravity (API) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 5 | Data Source: TRILOBITE |
Interval: 4302 to 4336
Formation tested: Marmaton | Date, Time: 23-FEB-00; 04:12:40 |
Initial Hydro Pressure: 2097 PSI
First Initial Flow Pressure: 24 PSI First Final Flow Pressure: 44 PSI Initial Shut-in Pressure: 855 PSI Second Initial Flow Pressure: 47 PSI Second Final Flow Pressure: 85 PSI Final Shut-in Pressure: 724 PSI Final Hydro Pressure: 2037 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4255 ft. |
Initial Flow: 1/4"" @ open built to 3"". Initial Shut-In: No return. Final Flow: Weak surface blow in 8 minutes built to 1/2"". Final Shut-In: No return. |
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 140 of Total Fluid 30 of Fluid in Drill Collars 110 of Fluid in Drill Pipe 20 of Drilling mud 120 of Mud cut water 32000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 6 | Data Source: TRILOBITE |
Interval: 4335 to 4425
Formation tested: Marm/altamot | Date, Time: 24-FEB-00; 12:42:02 |
Initial Hydro Pressure: 2136 PSI
First Initial Flow Pressure: 37 PSI First Final Flow Pressure: 60 PSI Initial Shut-in Pressure: 1079 PSI Second Initial Flow Pressure: 72 PSI Second Final Flow Pressure: 114 PSI Final Shut-in Pressure: 1049 PSI Final Hydro Pressure: 2133 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4349 ft. |
Initial Flow: Bottom of bucket in 10 minutes. Initial Shut-In: No return. Final Flow: Bottom of bucket in 1 minute. Final Shut-In: Bled off 1 1/2 minute. Return in 5 minutes. Weak surface blow died in 40 minutes. |
|
Bottom Hole Temperature: 115 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 210 of Total Fluid 30 of Fluid in Drill Collars 180 of Fluid in Drill Pipe 390 of Gas in pipe. 210 of Gassy oil cut mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 7 | Data Source: TRILOBITE |
Interval: 4484 to 4550
Formation tested: ftscott,chero,johnso | Date, Time: 25-FEB-00; 11:23:36 |
Initial Hydro Pressure: 2248 PSI
First Initial Flow Pressure: 33 PSI First Final Flow Pressure: 36 PSI Initial Shut-in Pressure: 50 PSI Second Initial Flow Pressure: 38 PSI Second Final Flow Pressure: 38 PSI Final Shut-in Pressure: 46 PSI Final Hydro Pressure: 2223 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.5 in. Drill Collar Length: 30 ft. Drill Pipe Length: 4473 ft. |
Initial Flow: Weak 1/2"" blow died in 25 minutes. Initial Shut-In: No return Final Flow: No blow. Final Shut-In: No return. |
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 10 of Total Fluid 10 of Fluid in Drill Collars 10 of drilling mud w/spots of oil | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |