Drill Stem Tests Database
Specific Well--15-101-21778
API: 15-101-21778
Operator: Belport Oil, Inc.
Field: Wildcat
Lease: SLEEPER-DEWERFF UNIT 'A'
Well 1
Location: T19S R27W, Sec. 18, W2 W2 E2
2640 South, 2310 West, from NE corner
Longitude: -100.3455979
Latitude: 38.4008516
County: Lane
Status: OIL
Spud Date: 23-FEB-00
Completion Date: 06-MAR-00
Plugging Date:
Total Depth: 4875
Form. at depth: MISSISSIPPIAN
Elevation: 2735 KB
Test Number: 4 Data Source: TRILOBITE
Interval: 4555 to 4620
Formation tested: Cherokee
Date, Time: 04-MAR-00; 19:10:33
Initial Hydro Pressure: 2256 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 14 PSI
Initial Shut-in Pressure: 185 PSI
Second Initial Flow Pressure: 15 PSI
Second Final Flow Pressure: 17 PSI
Final Shut-in Pressure: 100 PSI
Final Hydro Pressure: 2237 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 4112 ft.
Initial Flow: Weak surface blow died in 20 minutes.
Final Flow: No return blow.
Bottom Hole Temperature: 114 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
5 of Total Fluid
5 of Fluid in Drill Pipe
5 of Oil Spotted Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 4245 to 4255
Formation tested: L/KC 180'
Date, Time: 01-MAR-00; 08:08:28
Initial Hydro Pressure: 2083 PSI
First Initial Flow Pressure: 14 PSI
First Final Flow Pressure: 44 PSI
Initial Shut-in Pressure: 788 PSI
Second Initial Flow Pressure: 48 PSI
Second Final Flow Pressure: 86 PSI
Final Shut-in Pressure: 787 PSI
Final Hydro Pressure: 2053 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3774 ft.
Initial Flow: Weak surface blow built to 3"".
Final Flow: Weak surface blow built to 1"".
Bottom Hole Temperature: 123 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
151 of Total Fluid
151 of Fluid in Drill Pipe
1 of Free Oil
150 of Muddy water
55000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4270 to 4285
Formation tested: L/KC 200'
Date, Time: 01-MAR-00; 23:38:18
Initial Hydro Pressure: 2088 PSI
First Initial Flow Pressure: 27 PSI
First Final Flow Pressure: 154 PSI
Initial Shut-in Pressure: 815 PSI
Second Initial Flow Pressure: 162 PSI
Second Final Flow Pressure: 250 PSI
Final Shut-in Pressure: 812 PSI
Final Hydro Pressure: 2048 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3803 ft.
Initial Flow: Weak to fair blow off bottom in 4 minutes. Initial Shut-In: Surface return built to 10"".
Final Flow: Weak to fair blow off bottom in 8 minutes.
Final Shut-In: Surface return off bottom in 45 minutes.
Bottom Hole Temperature: 124 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
640 of Total Fluid
640 of Fluid in Drill Pipe
1430 of Gas in pipe.
460 of Gas cut oil
120 of Heavily mud cut oil
60 of Muddy water
49000 of Salinity (PPM)
37 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4304 to 4330
Formation tested: L/KC 220'
Date, Time: 02-MAR-00; 19:05:44
Initial Hydro Pressure: 2090 PSI
First Initial Flow Pressure: 34 PSI
First Final Flow Pressure: 283 PSI
Initial Shut-in Pressure: 810 PSI
Second Initial Flow Pressure: 294 PSI
Second Final Flow Pressure: 466 PSI
Final Shut-in Pressure: 792 PSI
Final Hydro Pressure: 2066 PSI
Tool Data
Hole Size: 8.875 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 2.8 ft.
Initial Flow: Fair to strong blow off bottom in 6 minutes. Initial Shut-In: Weak 1/2"" return throughout.
Final Flow: Weak to fair blow off bottom in 13 minutes.
Final Shut-In: Weak intermittent blow throughout.
Bottom Hole Temperature: 132 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
972 of Total Fluid
972 of Fluid in Drill Pipe
2 of Free Oil
970 of Sulfer Water
60000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.