|
API: 15-119-21020
Operator: Raydon Exploration, Inc. Field: Wildcat Lease: TABLE MESA Well 1-29 |
Location: T34S R30W, Sec. 29, W2 SE SE
640 North, 988 West, from SE corner Longitude: -100.6001454 Latitude: 37.0554748 County: Meade Status: O&G |
Spud Date: 02/11/2000
Completion Date: 03/30/2000 Plugging Date: Total Depth: 6460 Form. at depth: CHESTER Elevation: 2627 KB |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 4527 to 4541
Formation tested: Lansing ""A"" | Date, Time: 02/18/2000; 20:22:05 |
|
Initial Hydro Pressure: 2160 PSI
First Initial Flow Pressure: 142 PSI First Final Flow Pressure: 322 PSI Initial Shut-in Pressure: 1168 PSI Second Initial Flow Pressure: 394 PSI Second Final Flow Pressure: 622 PSI Final Shut-in Pressure: 1184 PSI Final Hydro Pressure: 2048 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 686 ft. Drill Pipe Length: 3820 ft. |
|
Initial Flow: Strong blow. Bottom of bucket immediately. Gas to surface in 8 minutes. Intial Shut-In: Strong blow bottom of bucket. Final Flow: Fair blow built to strong blow. Bottom of bucket in 6 minutes. See gas flow chart. Final Shut-In: Strong blow bottom of bucket. Gas will burn. |
|
|
Bottom Hole Temperature: 118 DEG F
Percent Porosity: 6 Samples: Caught one sample. Gas Recovery: Comments: | |
|
Recovery 1310 of Total Fluid 686 of Fluid in Drill Collars 624 of Fluid in Drill Pipe 3190 of Gas in pipe. 150 of Clean oil 100% oil 120 of Gassy oil cut mud 60 of Gassy oil cut mud & water 980 of Gassy salt water 27000 of Salinity (PPM) 31 of Gravity (API) | |
| View Pressures | View Recovery Gas |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 4787 to 4810
Formation tested: Kanas City | Date, Time: 02/20/2000; 12:27:22 |
|
Initial Hydro Pressure: 2331 PSI
First Initial Flow Pressure: 24 PSI First Final Flow Pressure: 36 PSI Initial Shut-in Pressure: 1256 PSI Second Initial Flow Pressure: 24 PSI Second Final Flow Pressure: 56 PSI Final Shut-in Pressure: 1192 PSI Final Hydro Pressure: 2248 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 686 ft. Drill Pipe Length: 4097 ft. |
|
Initial Flow: Strong blow. Bottom of bucket in 30 seconds. Intial Shut-In: Weak surface blow died in 15 minutes. Final Flow: Strong blow. Bottom of bucket immediately. Final Shut-In: No blow back. |
|
|
Bottom Hole Temperature: 1180 DEG F
Percent Porosity: 15 Samples: None Gas Recovery: Comments: | |
|
Recovery 150 of Total Fluid 150 of Fluid in Drill Collars 1655 of Gas in pipe. 150 of Gassy water cut mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 4 | Data Source: TRILOBITE |
|
Interval: 4817 to 4832
Formation tested: Kanas City | Date, Time: 02/21/2000; 11:40:34 |
|
Initial Hydro Pressure: 2373 PSI
First Initial Flow Pressure: 75 PSI First Final Flow Pressure: 106 PSI Initial Shut-in Pressure: 1444 PSI Second Initial Flow Pressure: 90 PSI Second Final Flow Pressure: 208 PSI Final Shut-in Pressure: 1430 PSI Final Hydro Pressure: 2278 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 328 ft. Drill Pipe Length: 4469 ft. |
|
Initial Flow: Very strong blow. Bottom of bucket immediately. Gas to surface in 5 minutes. Initial Shut-In: Weak blow back 1 1/2"" in bucket. Final Flow: Very strong. Bottom of bucket immediately. Final Shut-In: Strong blow to bottom of bucket. Gas will burn. |
|
|
Bottom Hole Temperature: 113 DEG F
Percent Porosity: 15 Samples: Caught one sample. Gas Recovery: Comments: | |
|
Recovery 558 of Total Fluid 328 of Fluid in Drill Collars 230 of Fluid in Drill Pipe 4239 of Gas in pipe 92 of Clean oil 100% oil 156 of Gassy oil cut mud 124 of Gassy oil water cut mud 186 of Gassy water 27000 of Salinity (PPM) 44 of Gravity (API) | |
| View Pressures | View Recovery Gas |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 4361 to 4425
Formation tested: Toronto | Date, Time: 02/17/2000; 18:31:31 |
|
Initial Hydro Pressure: 2093 PSI
First Initial Flow Pressure: 74 PSI First Final Flow Pressure: 73 PSI Initial Shut-in Pressure: 1321 PSI Second Initial Flow Pressure: 55 PSI Second Final Flow Pressure: 79 PSI Final Shut-in Pressure: 1322 PSI Final Hydro Pressure: 2077 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 686 ft. Drill Pipe Length: 3663 ft. |
|
Initial Flow: Strong blow. Bottom of bucket in 1 minute. Gas to surface in 19 minutes. Initial Shut-In: Weak surface blow. Final Flow: Bottom of bucket immediately. Gas will burn. See gas flow chart. Final Shut-In: Weak surface blow. |
|
|
Bottom Hole Temperature: 116 DEG F
Percent Porosity: 10 Samples: Caught one sample Gas Recovery: Comments: | |
|
Recovery 360 of Total Fluid 360 of Fluid in Drill Collars 3989 of Gas in pipe. 360 of Mud with trace of oil | |
| View Pressures | View Recovery Gas |