Drill Stem Tests Database
Specific Well--15-033-21071
API: 15-033-21071
Operator: Comanche Resources Co.
Field: Arlie
Lease: Arlie
Well 18-1
Location: T31S R19W, Sec. 18, E2 NE SW
1980 North, 1980 East, from SW corner
Longitude: -99.4287519
Latitude: 37.3434042
County: Comanche
Status: OIL
Spud Date: 03/31/2000
Completion Date: 05/05/2000
Plugging Date:
Total Depth: 5493
Form. at depth: ARBUCKLE
Elevation: 2132 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 4718 to 4753
Formation tested: Swope
Date, Time: 04/07/2000; 00:24:34
Initial Hydro Pressure: 2238 PSI
First Initial Flow Pressure: 78 PSI
First Final Flow Pressure: 161 PSI
Initial Shut-in Pressure: 1649 PSI
Second Initial Flow Pressure: 131 PSI
Second Final Flow Pressure: 228 PSI
Final Shut-in Pressure: 1664 PSI
Final Hydro Pressure: 2232 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 594 ft.
Drill Pipe Length: 4121 ft.
Initial Flow: Strong blow in 3 minutes.
Final Flow: Strong blow. Gas to surface in 35 minutes.
Final Shut-In: Had blow back.
Bottom Hole Temperature: 111 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
690 of Total Fluid
594 of Fluid in Drill Collars
96 of Fluid in Drill Pipe
240 of Clean oil
180 of Muddy gassy oil
120 of Gas & water cut oil
150 of Slightly oil cut water
67000 of Salinity (PPM)
43 of Gravity (API)
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5095 to 5136
Formation tested: Mississippi
Date, Time: 04/09/2000; 20:48:18
Initial Hydro Pressure: 2471 PSI
First Initial Flow Pressure: 43 PSI
First Final Flow Pressure: 71 PSI
Initial Shut-in Pressure: 1737 PSI
Second Initial Flow Pressure: 46 PSI
Second Final Flow Pressure: 109 PSI
Final Shut-in Pressure: 1748 PSI
Final Hydro Pressure: 2428 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 594 ft.
Drill Pipe Length: 4494 ft.
Initial Flow: Strong blow throughout. Initial Shut-In: Gas surfaced 5 minutes into shut-in.
Final Flow: Gas to surface, to weak to gauge.
Bottom Hole Temperature: 118 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
245 of Total Fluid
245 of Fluid in Drill Collars
65 of Slightly oil & gas cut mud
180 of Heavily oil & gas cut mud
39 of Gravity (API)
View Pressures View Recovery Gas