API: 15-033-21078
Operator: CRAWFORD OIL & GAS, INC. Field: Wildcat Lease: Cole Well 1 |
Location: T34S R18W, Sec. 9, SE SE NE
2968 North, 352 West, from SE corner Longitude: -99.27147 Latitude: 37.09966 County: Comanche Status: GAS-P&A |
Spud Date: 25-MAR-00
Completion Date: 12-APR-00 Plugging Date: 12-JUN-07 Total Depth: 6100 Form. at depth: VIOLA Elevation: 1886 KB |
spectral density log mismarked section 3 - RME 4/12/2001 |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5133 to 5155
Formation tested: Pawnee | Date, Time: 02-APR-00; 19:34:31 |
Initial Hydro Pressure: 2506 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 59 PSI Initial Shut-in Pressure: 1948 PSI Second Initial Flow Pressure: 23 PSI Second Final Flow Pressure: 75 PSI Final Shut-in Pressure: 1938 PSI Final Hydro Pressure: 2476 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5135 ft. |
Initial Flow: Strong blow -bottom of bucket in 75sec Gas to surface in 18 minutes (see gas volume report) Initial shutin: No blow Final Flow: Strong blow - see gas volume report Final Flow: Weak blow (1/2"") |
|
Bottom Hole Temperature: 117 DEG F
Percent Porosity: 12 Samples: Gas sample Gas Recovery: Comments: | |
Recovery 105 of Total Fluid 105 of Fluid in Drill Pipe 45 of Gas Cut Mud 5%gas 95%mud 60 of Muddy Water 37%mud 63%water 66000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5285 to 5330
Formation tested: Miss. | Date, Time: 03-APR-00; 22:49:18 |
Initial Hydro Pressure: 2608 PSI
First Initial Flow Pressure: 217 PSI First Final Flow Pressure: 130 PSI Initial Shut-in Pressure: 1723 PSI Second Initial Flow Pressure: 237 PSI Second Final Flow Pressure: 122 PSI Final Shut-in Pressure: 1787 PSI Final Hydro Pressure: 2575 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5289 ft. |
Initial Flow: Strong blow - gas to surface in 2 1/2 minutes (see gas volume report) Initial Shutin: No blow Final Flow: Strong blow - see gas volume report Final Shutin: No blow |
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 16 Samples: Gas sample Gas Recovery: Comments: | |
Recovery 190 of Total Fluid 190 of Fluid in Drill Pipe 190 of Gas Cut Mud 8%gas 92%mud 6000 of Salinity (PPM) | |
View Pressures | View Recovery Gas |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |