Drill Stem Tests Database
Specific Well--15-033-21078
API: 15-033-21078
Operator: CRAWFORD OIL & GAS, INC.
Field: Wildcat
Lease: Cole
Well 1
Location: T34S R18W, Sec. 9, SE SE NE
2968 North, 352 West, from SE corner
Longitude: -99.27147
Latitude: 37.09966
County: Comanche
Status: GAS-P&A
Spud Date: 25-MAR-00
Completion Date: 12-APR-00
Plugging Date: 12-JUN-07
Total Depth: 6100
Form. at depth: VIOLA
Elevation: 1886 KB
spectral density log mismarked section 3 - RME 4/12/2001

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 5133 to 5155
Formation tested: Pawnee
Date, Time: 02-APR-00; 19:34:31
Initial Hydro Pressure: 2506 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 59 PSI
Initial Shut-in Pressure: 1948 PSI
Second Initial Flow Pressure: 23 PSI
Second Final Flow Pressure: 75 PSI
Final Shut-in Pressure: 1938 PSI
Final Hydro Pressure: 2476 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5135 ft.
Initial Flow: Strong blow -bottom of bucket in 75sec Gas to surface in 18 minutes (see gas volume report) Initial shutin: No blow
Final Flow: Strong blow - see gas volume report
Final Flow: Weak blow (1/2"")
Bottom Hole Temperature: 117 DEG F
Percent Porosity: 12
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
105 of Total Fluid
105 of Fluid in Drill Pipe
45 of Gas Cut Mud 5%gas 95%mud
60 of Muddy Water 37%mud 63%water
66000 of Salinity (PPM)
View Pressures View Recovery Gas
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5285 to 5330
Formation tested: Miss.
Date, Time: 03-APR-00; 22:49:18
Initial Hydro Pressure: 2608 PSI
First Initial Flow Pressure: 217 PSI
First Final Flow Pressure: 130 PSI
Initial Shut-in Pressure: 1723 PSI
Second Initial Flow Pressure: 237 PSI
Second Final Flow Pressure: 122 PSI
Final Shut-in Pressure: 1787 PSI
Final Hydro Pressure: 2575 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 5289 ft.
Initial Flow: Strong blow - gas to surface in 2 1/2 minutes (see gas volume report) Initial Shutin: No blow
Final Flow: Strong blow - see gas volume report
Final Shutin: No blow
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 16
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
190 of Total Fluid
190 of Fluid in Drill Pipe
190 of Gas Cut Mud 8%gas 92%mud
6000 of Salinity (PPM)
View Pressures View Recovery Gas