|
API: 15-033-21078
Operator: CRAWFORD OIL & GAS, INC. Field: Wildcat Lease: Cole Well 1 |
Location: T34S R18W, Sec. 9, SE SE NE
2968 North, 352 West, from SE corner Longitude: -99.27147 Latitude: 37.09966 County: Comanche Status: GAS-P&A |
Spud Date: 25-MAR-00
Completion Date: 12-APR-00 Plugging Date: 12-JUN-07 Total Depth: 6100 Form. at depth: VIOLA Elevation: 1886 KB |
| spectral density log mismarked section 3 - RME 4/12/2001 | ||
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 5133 to 5155
Formation tested: Pawnee | Date, Time: 02-APR-00; 19:34:31 |
|
Initial Hydro Pressure: 2506 PSI
First Initial Flow Pressure: 20 PSI First Final Flow Pressure: 59 PSI Initial Shut-in Pressure: 1948 PSI Second Initial Flow Pressure: 23 PSI Second Final Flow Pressure: 75 PSI Final Shut-in Pressure: 1938 PSI Final Hydro Pressure: 2476 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5135 ft. |
|
Initial Flow: Strong blow -bottom of bucket in 75sec Gas to surface in 18 minutes (see gas volume report) Initial shutin: No blow Final Flow: Strong blow - see gas volume report Final Flow: Weak blow (1/2"") |
|
|
Bottom Hole Temperature: 117 DEG F
Percent Porosity: 12 Samples: Gas sample Gas Recovery: Comments: | |
|
Recovery 105 of Total Fluid 105 of Fluid in Drill Pipe 45 of Gas Cut Mud 5%gas 95%mud 60 of Muddy Water 37%mud 63%water 66000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 5285 to 5330
Formation tested: Miss. | Date, Time: 03-APR-00; 22:49:18 |
|
Initial Hydro Pressure: 2608 PSI
First Initial Flow Pressure: 217 PSI First Final Flow Pressure: 130 PSI Initial Shut-in Pressure: 1723 PSI Second Initial Flow Pressure: 237 PSI Second Final Flow Pressure: 122 PSI Final Shut-in Pressure: 1787 PSI Final Hydro Pressure: 2575 PSI |
Tool Data Hole Size: 7.875 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 5289 ft. |
|
Initial Flow: Strong blow - gas to surface in 2 1/2 minutes (see gas volume report) Initial Shutin: No blow Final Flow: Strong blow - see gas volume report Final Shutin: No blow |
|
|
Bottom Hole Temperature: 123 DEG F
Percent Porosity: 16 Samples: Gas sample Gas Recovery: Comments: | |
|
Recovery 190 of Total Fluid 190 of Fluid in Drill Pipe 190 of Gas Cut Mud 8%gas 92%mud 6000 of Salinity (PPM) | |
| View Pressures | View Recovery Gas |