Drill Stem Tests Database
Specific Well--15-097-21453
API: 15-097-21453
Operator: James B. Read Oper. Inc.
Field: Glick
Lease: ED PERRY-ROBBINS
Well 1
Location: T30S R16W, Sec. 15, SE
1250 North, 1250 West, from SE corner
Longitude: -99.0523323
Latitude: 37.4305723
County: Kiowa
Status: D&A
Spud Date: 05-MAY-00
Completion Date: 18-MAY-00
Plugging Date: 18-MAY-00
Total Depth: 4990
Form. at depth: MISSISSIPPIAN
Elevation: 1892 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 2712 to 2764
Formation tested: Cottonwood
Date, Time: 09-MAY-00; 05:59:18
Initial Hydro Pressure: 1342 PSI
First Initial Flow Pressure: 754 PSI
First Final Flow Pressure: 962 PSI
Initial Shut-in Pressure: 978 PSI
Second Initial Flow Pressure: 969 PSI
Second Final Flow Pressure: 980 PSI
Final Shut-in Pressure: 982 PSI
Final Hydro Pressure: 1269 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 620 ft.
Drill Pipe Length: 2097 ft.
Initial Flow: Strong blow. Bottom of bucket in 35 seconds. Initial Shut-In: Weak blow. (1/2"")
Final Flow: Fair blow. Slow increase to 9"".
Final Shut-In: No blow.
Bottom Hole Temperature: 94 DEG F
Percent Porosity: 20
Samples: None
Gas Recovery:
Comments:
Recovery
2010 of Total Fluid
620 of Fluid in Drill Collars
1390 of Fluid in Drill Pipe
1000 of Watery mud
1010 of Clean Salt water
76000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4060 to 4122
Formation tested: Lansing
Date, Time: 12-MAY-00; 01:39:30
Initial Hydro Pressure: 1943 PSI
First Initial Flow Pressure: 341 PSI
First Final Flow Pressure: 471 PSI
Initial Shut-in Pressure: 1293 PSI
Second Initial Flow Pressure: 430 PSI
Second Final Flow Pressure: 768 PSI
Final Shut-in Pressure: 1274 PSI
Final Hydro Pressure: 1923 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 620 ft.
Drill Pipe Length: 3424 ft.
Initial Flow: Strong blow. Gas to surface in 3 minutes. (see gas volume report) Initial Shut-In: Fair blow.
Final Flow: Strong blow. (see gas volume report)
Final Shut-In: Fair to strong blow.
Bottom Hole Temperature: 120 DEG F
Percent Porosity: 16
Samples: Gas sample
Gas Recovery:
Comments:
Recovery
1740 of Total Fluid
620 of Fluid in Drill Collars
1120 of Fluid in Drill Pipe
140 of Drilling mud
1600 of Gas & mud cut water
125000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 4680 to 4710
Formation tested: Kinderhook
Date, Time: 14-MAY-00; 11:24:17
Initial Hydro Pressure: 2323 PSI
First Initial Flow Pressure: 20 PSI
First Final Flow Pressure: 38 PSI
Initial Shut-in Pressure: 111 PSI
Second Initial Flow Pressure: 20 PSI
Second Final Flow Pressure: 24 PSI
Final Shut-in Pressure: 79 PSI
Final Hydro Pressure: 2292 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 620 ft.
Drill Pipe Length: 4045 ft.
Initial Flow: Weak blow. 1/4"" or less. Initial Shut-In: No blow.
Final Flow: Weak surface blow.
Final Shut-In: No blow.
Bottom Hole Temperature: 121 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Collars
15 of Drilling mud
4000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 4046 to 4074
Formation tested: Lansing
Date, Time: 16-MAY-00; 12:03:17
Initial Hydro Pressure: 2045 PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2049 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 372 ft.
Drill Pipe Length: 3665 ft.
Tried setting hook tool several times over approximately 30' of hole. Aborted test after approximately 2 1/2 hours of failure.
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 4046 to 4074
Formation tested: Lansing
Date, Time: 16-MAY-00; 20:28:43
Initial Hydro Pressure: 2040 PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 2005 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 372 ft.
Drill Pipe Length: 3665 ft.
Initial Flow: Strong blow. Upper packers failing. Misrun. Hookwall tool sliding by target (4109'), and setting solid @ approximately 4116'. Reset hookwall tool 4 times @ this depth but was unsuccessful getting packers to seat. FSI:
Bottom Hole Temperature: 111 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
672 of Total Fluid
372 of Fluid in Drill Collars
300 of Fluid in Drill Pipe
672 of Drilling mud
4000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 4045 to 4075
Formation tested: Lansing
Date, Time: 17-MAY-00; 12:22:04
Initial Hydro Pressure: 2017 PSI
First Initial Flow Pressure: PSI
First Final Flow Pressure: PSI
Initial Shut-in Pressure: PSI
Second Initial Flow Pressure: PSI
Second Final Flow Pressure: PSI
Final Shut-in Pressure: PSI
Final Hydro Pressure: 1996 PSI
Tool Data
Hole Size: 7.875 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 372 ft.
Drill Pipe Length: 3665 ft.
Initial Flow: Strong blow. Upper packers failing. MISRUN! Hookwall tool set solid! Packers failed! Tried setting hookwall tool several times both higher and lower so as to move packers again, but had no success. FSI:
Bottom Hole Temperature: 108 DEG F
Percent Porosity: 10
Samples: None
Gas Recovery:
Comments:
Recovery
792 of Total Fluid
372 of Fluid in Drill Collars
420 of Fluid in Drill Pipe
792 of Drilling mud
7000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.