Drill Stem Tests Database
Specific Well--15-159-22377
API: 15-159-22377
Operator: EAGLE CREEK CORP.
Field: Galt Ext
Lease: Wesseler
Well 1-4
Location: T18S R7W, Sec. 4, NE NE NW
4950 North, 2310 East, from SW corner
Longitude: -98.1006904
Latitude: 38.5211389
County: Rice
Status: D&A
Spud Date: 30-MAR-00
Completion Date: 05-APR-00
Plugging Date: 05-APR-00
Total Depth: 3300
Form. at depth: MAQUOKETA
Elevation: 1719 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3153 to 3194
Formation tested: Cong Sd
Date, Time: 04-APR-00; 22:13:24
Initial Hydro Pressure: 1531 PSI
First Initial Flow Pressure: 29 PSI
First Final Flow Pressure: 62 PSI
Initial Shut-in Pressure: 1079 PSI
Second Initial Flow Pressure: 69 PSI
Second Final Flow Pressure: 115 PSI
Final Shut-in Pressure: 1084 PSI
Final Hydro Pressure: 1497 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 242 ft.
Drill Pipe Length: 2901 ft.
Initial Flow: Weak-building to 3"".
Final Flow: Weak building to 1/2"".
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
190 of Total Fluid
190 of Fluid in Drill Collars
130 of Drilling mud
60 of Muddy water
25000 of Salinity (PPM)
View Pressures No Recovery Gas data.