Drill Stem Tests Database
Specific Well--15-167-23166
API: 15-167-23166
Operator: ESP Development,Inc.
Field: Hagaman North
Lease: Eulert Ranch 'C'
Well 2
Location: T11S R15W, Sec. 22, NE NW SW
2245 North, 4305 West, from SE corner
Longitude: -98.9785395
Latitude: 39.0807844
County: Russell
Status: OIL
Spud Date: 21-MAR-00
Completion Date: 28-MAR-00
Plugging Date:
Total Depth: 3315
Form. at depth: ARBUCKLE
Elevation: 1846 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 2699 to 2720
Formation tested: Topeka
Date, Time: 24-MAR-00; 20:49:40
Initial Hydro Pressure: 1261 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 37 PSI
Initial Shut-in Pressure: 767 PSI
Second Initial Flow Pressure: 42 PSI
Second Final Flow Pressure: 47 PSI
Final Shut-in Pressure: 744 PSI
Final Hydro Pressure: 1233 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 2684 ft.
Initial Flow: Strong bottom of bucket in 18 minutes
Final Flow: Strong bottom of bucket in 5 minutes.
Bottom Hole Temperature: 92 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Pipe
755 of Gas in pipe.
90 of Oil cut mud
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3000 to 3063
Formation tested: A-E LKC
Date, Time: 26-MAR-00; 02:07:36
Initial Hydro Pressure: 1486 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 75 PSI
Initial Shut-in Pressure: 518 PSI
Second Initial Flow Pressure: 61 PSI
Second Final Flow Pressure: 103 PSI
Final Shut-in Pressure: 521 PSI
Final Hydro Pressure: 1444 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 2998 ft.
Initial Flow: Weak- building to 3""
Final Flow: Weak building to 1 1/2""
Bottom Hole Temperature: 100 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
150 of Total Fluid
150 of Fluid in Drill Pipe
150 of Drilling mud
View Pressures No Recovery Gas data.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 3298 to 3312
Formation tested: Arbuckle
Date, Time: 27-MAR-00; 07:35:54
Initial Hydro Pressure: 1635 PSI
First Initial Flow Pressure: 16 PSI
First Final Flow Pressure: 27 PSI
Initial Shut-in Pressure: 944 PSI
Second Initial Flow Pressure: 28 PSI
Second Final Flow Pressure: 46 PSI
Final Shut-in Pressure: 939 PSI
Final Hydro Pressure: 1635 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3303 ft.
Initial Flow: Weak building to 2""
Final Flow: Weak building to
Bottom Hole Temperature: 103 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
90 of Total Fluid
90 of Fluid in Drill Pipe
40 of Clean oil
50 of Oil cut mud
30 of Gravity (API)
View Pressures No Recovery Gas data.