|
API: 15-167-23166
Operator: ESP Development,Inc. Field: Hagaman North Lease: Eulert Ranch 'C' Well 2 |
Location: T11S R15W, Sec. 22, NE NW SW
2245 North, 4305 West, from SE corner Longitude: -98.9785395 Latitude: 39.0807844 County: Russell Status: OIL |
Spud Date: 21-MAR-00
Completion Date: 28-MAR-00 Plugging Date: Total Depth: 3315 Form. at depth: ARBUCKLE Elevation: 1846 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 2699 to 2720
Formation tested: Topeka | Date, Time: 24-MAR-00; 20:49:40 |
|
Initial Hydro Pressure: 1261 PSI
First Initial Flow Pressure: 26 PSI First Final Flow Pressure: 37 PSI Initial Shut-in Pressure: 767 PSI Second Initial Flow Pressure: 42 PSI Second Final Flow Pressure: 47 PSI Final Shut-in Pressure: 744 PSI Final Hydro Pressure: 1233 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 2684 ft. |
|
Initial Flow: Strong bottom of bucket in 18 minutes Final Flow: Strong bottom of bucket in 5 minutes. |
|
|
Bottom Hole Temperature: 92 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 90 of Total Fluid 90 of Fluid in Drill Pipe 755 of Gas in pipe. 90 of Oil cut mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3000 to 3063
Formation tested: A-E LKC | Date, Time: 26-MAR-00; 02:07:36 |
|
Initial Hydro Pressure: 1486 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 75 PSI Initial Shut-in Pressure: 518 PSI Second Initial Flow Pressure: 61 PSI Second Final Flow Pressure: 103 PSI Final Shut-in Pressure: 521 PSI Final Hydro Pressure: 1444 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 2998 ft. |
|
Initial Flow: Weak- building to 3"" Final Flow: Weak building to 1 1/2"" |
|
|
Bottom Hole Temperature: 100 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 150 of Total Fluid 150 of Fluid in Drill Pipe 150 of Drilling mud | |
| View Pressures | No Recovery Gas data. |
| Test Number: 3 | Data Source: TRILOBITE |
|
Interval: 3298 to 3312
Formation tested: Arbuckle | Date, Time: 27-MAR-00; 07:35:54 |
|
Initial Hydro Pressure: 1635 PSI
First Initial Flow Pressure: 16 PSI First Final Flow Pressure: 27 PSI Initial Shut-in Pressure: 944 PSI Second Initial Flow Pressure: 28 PSI Second Final Flow Pressure: 46 PSI Final Shut-in Pressure: 939 PSI Final Hydro Pressure: 1635 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3303 ft. |
|
Initial Flow: Weak building to 2"" Final Flow: Weak building to |
|
|
Bottom Hole Temperature: 103 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 90 of Total Fluid 90 of Fluid in Drill Pipe 40 of Clean oil 50 of Oil cut mud 30 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |