API: 15-175-21795
Operator: Raydon Exploration, Inc. Field: Adobe Lease: Adams, R.E. Well 1-12 |
Location: T35S R31W, Sec. 12, NE
1320 South, 2100 West, from NE corner Longitude: -100.6398891 Latitude: 37.021203 County: Seward Status: D&A |
Spud Date: 04-APR-00
Completion Date: 10-JUN-00 Plugging Date: 30-AUG-01 Total Depth: 6521 Form. at depth: CHESTER Elevation: 2597 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5290 to 5321
Formation tested: Marmaton | Date, Time: 12-APR-00; 01:43:46 |
Initial Hydro Pressure: 2520 PSI
First Initial Flow Pressure: 28 PSI First Final Flow Pressure: 63 PSI Initial Shut-in Pressure: 1643 PSI Second Initial Flow Pressure: 71 PSI Second Final Flow Pressure: 118 PSI Final Shut-in Pressure: 1634 PSI Final Hydro Pressure: 2460 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.38 in. Drill Collar Length: 389 ft. Drill Pipe Length: 4901 ft. |
Initial Flow: Weak blow built to 4"". Initial Shut-In: No blow back. Final Flow: Weak surface blow 1/2"" never built Final Shut-In: No blow back. |
|
Bottom Hole Temperature: 120 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 250 of Total Fluid 250 of Fluid in Drill Collars 100 of Mud 150 of Muddy water 42000 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 2 | Data Source: TRILOBITE |
Interval: 5914 to 5980
Formation tested: Morrow/Chester | Date, Time: 15-APR-00; 05:43:08 |
Initial Hydro Pressure: 2832 PSI
First Initial Flow Pressure: 21 PSI First Final Flow Pressure: 30 PSI Initial Shut-in Pressure: 153 PSI Second Initial Flow Pressure: 24 PSI Second Final Flow Pressure: 31 PSI Final Shut-in Pressure: 277 PSI Final Hydro Pressure: 2812 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 455 ft. Drill Pipe Length: 5450 ft. |
Initial Flow: Weak 1"" built to 6"" in bucket in 30 minutes. Initial Shut-In: No blow back. Final Flow: Weak 2"" built to 4 1/2"" in bucket in 60 minutes. Final Shut-In: No blow back. Remarks: Est. 15 Ft. of pay. Pit chlorides 2,400 PPM. |
|
Bottom Hole Temperature: 129 DEG F
Percent Porosity: 10 Samples: None Gas Recovery: Comments: | |
Recovery 30 of Total Fluid 30 of Fluid in Drill Collars 30 of Mud 2600 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 3 | Data Source: TRILOBITE |
Interval: 6170 to 6240
Formation tested: Lower Chester | Date, Time: 17-APR-00; 00:15:08 |
Initial Hydro Pressure: 2969 PSI
First Initial Flow Pressure: 28 PSI First Final Flow Pressure: 39 PSI Initial Shut-in Pressure: 103 PSI Second Initial Flow Pressure: 40 PSI Second Final Flow Pressure: 43 PSI Final Shut-in Pressure: 126 PSI Final Hydro Pressure: 2926 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 455 ft. Drill Pipe Length: 5694 ft. |
Initial Flow: Weak 1"" built to 10"" in bucket in 30 minutes. Initial Shut-In: No blow back. Final Flow: Weak 2"" built to 4"" in bucket in 60 minutes. Final Shut-In: No blow back. Remarks: Est. 5 Ft. of Pay. |
|
Bottom Hole Temperature: 130 DEG F
Percent Porosity: 10 Samples: None Gas Recovery: Comments: | |
Recovery 55 of Total Fluid 55 of Fluid in Drill Collars 55 of Thin Mud 2800 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |
Test Number: 4 | Data Source: TRILOBITE |
Interval: 6390 to 6420
Formation tested: St. Louis | Date, Time: 19-APR-00; 13:39:06 |
Initial Hydro Pressure: 3205 PSI
First Initial Flow Pressure: 23 PSI First Final Flow Pressure: 26 PSI Initial Shut-in Pressure: 1809 PSI Second Initial Flow Pressure: 28 PSI Second Final Flow Pressure: 31 PSI Final Shut-in Pressure: 1957 PSI Final Hydro Pressure: 3112 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 455 ft. Drill Pipe Length: 5941 ft. |
Initial Flow: Surface blow, died in 13 minutes. Final Flow: No blow. Remarks: 12 Ft. of Pay. |
|
Bottom Hole Temperature: 140 DEG F
Percent Porosity: 6 Samples: None Gas Recovery: Comments: | |
Recovery 5 of Total Fluid 5 of Fluid in Drill Collars 5 of Mud 2900 of Salinity (PPM) | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |