Drill Stem Tests Database
Specific Well--15-033-21085
API: 15-033-21085
Operator: DAYSTAR PETROLEUM INC.
Field: Collier Flats
Lease: Christopher 'A'
Well 1
Location: T33S R19W, Sec. 32, N2 NE SW
2240 North, 3254 West, from SE corner
Longitude: -99.4085445
Latitude: 37.1261821
County: Comanche
Status: GAS
Spud Date: 24-APR-00
Completion Date: 08-JUL-00
Plugging Date:
Total Depth: 6156
Form. at depth: VIOLA
Elevation: 1894 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4825 to 4870
Formation tested: Swope
Date, Time: 02-MAY-00; 08:55:26
Initial Hydro Pressure: 2396 PSI
First Initial Flow Pressure: 21 PSI
First Final Flow Pressure: 21 PSI
Initial Shut-in Pressure: 56 PSI
Second Initial Flow Pressure: 22 PSI
Second Final Flow Pressure: 25 PSI
Final Shut-in Pressure: 39 PSI
Final Hydro Pressure: 2382 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 291.47 ft.
Drill Pipe Length: ft.
Initial Flow: Weak blow built to 1/2"" slowly died off in 18 minutes. Initial Shut-In: Dead blow.
Final Flow: Dead blow.Flush tool.No blow
Final Shut-In: No blow back.
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
15 of Total Fluid
15 of Fluid in Drill Collars
15 of Drilling mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5044 to 5075
Formation tested: Altamont
Date, Time: 03-MAY-00; 16:16:07
Initial Hydro Pressure: 2543 PSI
First Initial Flow Pressure: 26 PSI
First Final Flow Pressure: 34 PSI
Initial Shut-in Pressure: 359 PSI
Second Initial Flow Pressure: 39 PSI
Second Final Flow Pressure: 55 PSI
Final Shut-in Pressure: 1171 PSI
Final Hydro Pressure: 2450 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.35 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 291.47 ft.
Drill Pipe Length: ft.
Initial Flow: Weak blow built to 5 1/2"" in H2O bucket. Initial Shut-In: Bled down for 1 minute. No blow back.
Final Flow: Weak blow built to bottom of bucket in 51 minutes.
Final Shut-In: Bled down for 5 minutes. No blow back
Bottom Hole Temperature: 121 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
70 of Total Fluid
70 of Fluid in Drill Collars
540 of Gas in pipe.
70 of Slightly gas cut mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 3 Data Source: TRILOBITE
Interval: 5081 to 5107
Formation tested: Pawnee
Date, Time: 04-MAY-00; 09:28:21
Initial Hydro Pressure: 2518 PSI
First Initial Flow Pressure: 60 PSI
First Final Flow Pressure: 75 PSI
Initial Shut-in Pressure: 1616 PSI
Second Initial Flow Pressure: 56 PSI
Second Final Flow Pressure: 103 PSI
Final Shut-in Pressure: 1575 PSI
Final Hydro Pressure: 2528 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 291.47 ft.
Drill Pipe Length: ft.
Initial Flow: Fair blow bottom of bucket in 2 minutes. Initial Shut-In: Bled down for 5 minutes. No blow back
Final Flow: Strong blow bottom of bucket in 10 seconds. Gas to surface in 2 minutes. Gauge gas.
Final Shut-In: Bled down for 10 minutes. Built back to very weak surface blow.
Bottom Hole Temperature: 121 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
232 of Total Fluid
232 of Fluid in Drill Collars
4851 of Gas in pipe.
60 of Slightly gas & water cut mud
120 of Slightly gas & water cut mud
52 of Slightly gas & mud cut water
60000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 4 Data Source: TRILOBITE
Interval: 5126 to 5155
Formation tested: Fort Scott.
Date, Time: 05-MAY-00; 07:27:55
Initial Hydro Pressure: 2556 PSI
First Initial Flow Pressure: 89 PSI
First Final Flow Pressure: 84 PSI
Initial Shut-in Pressure: 1931 PSI
Second Initial Flow Pressure: 40 PSI
Second Final Flow Pressure: 84 PSI
Final Shut-in Pressure: 1930 PSI
Final Hydro Pressure: 2504 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 291.47 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 30 seconds. Gas to surface in 7 minutes. Gauge gas. Initial Shut-In: Bled down for 15 minutes. No blow back.
Final Flow: Strong blow bottom of bucket in 10 seconds. Gauge gas.
Final Shut-In: Bled down for 20 minutes. No blow back.
Bottom Hole Temperature: 112 DEG F
Percent Porosity:
Samples: Caraway Analythical 728 N.Roosevelt
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
4997 of Gas in pipe.
120 of Slightly gas cut mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 5 Data Source: TRILOBITE
Interval: 5196 to 5290
Formation tested: Mississippi
Date, Time: 06-MAY-00; 08:56:30
Initial Hydro Pressure: 2671 PSI
First Initial Flow Pressure: 66 PSI
First Final Flow Pressure: 80 PSI
Initial Shut-in Pressure: 1418 PSI
Second Initial Flow Pressure: 67 PSI
Second Final Flow Pressure: 104 PSI
Final Shut-in Pressure: 1748 PSI
Final Hydro Pressure: 2584 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 291.47 ft.
Drill Pipe Length: ft.
Initial Flow: Fair blow bottom of bucket in 90 seconds. Gas to surface in 22 minutes Gauge gas. Initial Shut-In: Bled down for 8 minutes. No blow back.
Final Flow: Strong blow Bottom of bucket in 10 seconds. Gauge gas.
Final Shut-In: Bled down for 11 minutes. No blow back.
Bottom Hole Temperature: 129 DEG F
Percent Porosity:
Samples: Caraway Analytical
Gas Recovery:
Comments:
Recovery
120 of Total Fluid
120 of Fluid in Drill Collars
5080 of Gas in pipe.
210 of Slightly gas cut mud
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 6 Data Source: TRILOBITE
Interval: 6058 to 6126
Formation tested: Viola
Date, Time: 09-MAY-00; 19:14:03
Initial Hydro Pressure: 3145 PSI
First Initial Flow Pressure: 477 PSI
First Final Flow Pressure: 491 PSI
Initial Shut-in Pressure: 2247 PSI
Second Initial Flow Pressure: 406 PSI
Second Final Flow Pressure: 515 PSI
Final Shut-in Pressure: 2252 PSI
Final Hydro Pressure: 3060 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 291.47 ft.
Drill Pipe Length: ft.
Initial Flow: Strong blow bottom of bucket in 15 seconds. Gas to surface in 5 minutes. Gauge gas. Initial Shut-In: Bled down for 30 minutes. Built back to bottom of bucket in 10 minutes.
Final Flow: Strong blow bottom of bucket in 10 seconds. Gauge gas. Fluid to surface @ 25 minutes.
Final Shut-In: Bled down for 60 minutes. Built back to bottom of bucket in 15 minutes.
Bottom Hole Temperature: 144 DEG F
Percent Porosity:
Samples: Caraway analytical 728 N.Roosevelt
Gas Recovery:
Comments:
Recovery
747 of Total Fluid
291 of Fluid in Drill Collars
456 of Fluid in Drill Pipe
5301 of Gas in pipe.
120 of Slightly gas & water cut mud
500 of Heavily gas & water cut mud
127 of Slightly mud cut gassy water
120000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.