Drill Stem Tests Database
Specific Well--15-051-25030
API: 15-051-25030
Operator: Shelby Resources LLC
Field: Gottschalk Southeast
Lease: Zimmer
Well 1
Location: T15S R17W, Sec. 31, S2 N2 N2 SW
2120 North, 1245 East, from SW corner
Longitude: -99.2601437
Latitude: 38.7027419
County: Ellis
Status: OIL
Spud Date: 12-APR-00
Completion Date: 20-APR-00
Plugging Date:
Total Depth: 3535
Form. at depth: ARBUCKLE
Elevation: 1908 KB

Download DST Test Data

Test Number: 1 Data Source: TRILOBITE
Interval: 3305 to 3362
Formation tested: I-J LKC
Date, Time: 18-APR-00; 12:09:33
Initial Hydro Pressure: 1647 PSI
First Initial Flow Pressure: 130 PSI
First Final Flow Pressure: 271 PSI
Initial Shut-in Pressure: 1146 PSI
Second Initial Flow Pressure: 308 PSI
Second Final Flow Pressure: 467 PSI
Final Shut-in Pressure: 1133 PSI
Final Hydro Pressure: 1618 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3291 ft.
Initial Flow: Strong- bottom of bucket Gas to surface in 16 mintues. Too Small to measure. Initial Shut-In: Bled off blow- blow came back.
Final Flow: Strong bottom of bucket in 2 minutes.
Final Shut-In: Bled off blow- blow came back.
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 20
Samples:
Gas Recovery:
Comments:
Recovery
1330 of Total Fluid
1330 of Fluid in Drill Pipe
1330 of Clean Gassy Oil
34 of Gravity (API)
View Pressures No Recovery Gas data.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3472 to 3486
Formation tested: Penn Sd
Date, Time: 19-APR-00; 14:33:07
Initial Hydro Pressure: 1763 PSI
First Initial Flow Pressure: 312 PSI
First Final Flow Pressure: 843 PSI
Initial Shut-in Pressure: 1169 PSI
Second Initial Flow Pressure: 923 PSI
Second Final Flow Pressure: 1155 PSI
Final Shut-in Pressure: 1175 PSI
Final Hydro Pressure: 1735 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3480 ft.
Initial Flow: Strong-bottom of bucket in 45 seconds Initial Shut-In: Bled off blow-blow came back.
Final Flow: Strong-bottom of bucket in 35 seconds
Final Shut-In: Bled off blow-no blow back.
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2542 of Total Fluid
2542 of Fluid in Drill Pipe
1000 of Muddy water
1542 of Slightly muddy water
34000 of Salinity (PPM)
View Pressures No Recovery Gas data.