Drill Stem Tests Database
Specific Well--15-051-25030
API: 15-051-25030
Operator: Shelby Resources LLC
Field: Gottschalk Southeast
Lease: Zimmer
Well 1
Location: T15S R17W, Sec. 31, S2 N2 N2 SW
2120 North, 1245 East, from SW corner
Longitude: -99.2601437
Latitude: 38.7027419
County: Ellis
Status: OIL
Spud Date: 12-APR-00
Completion Date: 20-APR-00
Plugging Date:
Total Depth: 3535
Form. at depth: ARBUCKLE
Elevation: 1908 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 3305 to 3362
Formation tested: I-J LKC
Date, Time: 18-APR-00; 12:09:33
Initial Hydro Pressure: 1647 PSI
First Initial Flow Pressure: 130 PSI
First Final Flow Pressure: 271 PSI
Initial Shut-in Pressure: 1146 PSI
Second Initial Flow Pressure: 308 PSI
Second Final Flow Pressure: 467 PSI
Final Shut-in Pressure: 1133 PSI
Final Hydro Pressure: 1618 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3291 ft.
Initial Flow: Strong- bottom of bucket Gas to surface in 16 mintues. Too Small to measure. Initial Shut-In: Bled off blow- blow came back.
Final Flow: Strong bottom of bucket in 2 minutes.
Final Shut-In: Bled off blow- blow came back.
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 20
Samples:
Gas Recovery:
Comments:
Recovery
1330 of Total Fluid
1330 of Fluid in Drill Pipe
1330 of Clean Gassy Oil
34 of Gravity (API)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 3472 to 3486
Formation tested: Penn Sd
Date, Time: 19-APR-00; 14:33:07
Initial Hydro Pressure: 1763 PSI
First Initial Flow Pressure: 312 PSI
First Final Flow Pressure: 843 PSI
Initial Shut-in Pressure: 1169 PSI
Second Initial Flow Pressure: 923 PSI
Second Final Flow Pressure: 1155 PSI
Final Shut-in Pressure: 1175 PSI
Final Hydro Pressure: 1735 PSI
Tool Data
Hole Size: 7.88 in.
Drill Collar ID: in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: ft.
Drill Pipe Length: 3480 ft.
Initial Flow: Strong-bottom of bucket in 45 seconds Initial Shut-In: Bled off blow-blow came back.
Final Flow: Strong-bottom of bucket in 35 seconds
Final Shut-In: Bled off blow-no blow back.
Bottom Hole Temperature: 110 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2542 of Total Fluid
2542 of Fluid in Drill Pipe
1000 of Muddy water
1542 of Slightly muddy water
34000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.