|
API: 15-051-25030
Operator: Shelby Resources LLC Field: Gottschalk Southeast Lease: Zimmer Well 1 |
Location: T15S R17W, Sec. 31, S2 N2 N2 SW
2120 North, 1245 East, from SW corner Longitude: -99.2601437 Latitude: 38.7027419 County: Ellis Status: OIL |
Spud Date: 12-APR-00
Completion Date: 20-APR-00 Plugging Date: Total Depth: 3535 Form. at depth: ARBUCKLE Elevation: 1908 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3305 to 3362
Formation tested: I-J LKC | Date, Time: 18-APR-00; 12:09:33 |
|
Initial Hydro Pressure: 1647 PSI
First Initial Flow Pressure: 130 PSI First Final Flow Pressure: 271 PSI Initial Shut-in Pressure: 1146 PSI Second Initial Flow Pressure: 308 PSI Second Final Flow Pressure: 467 PSI Final Shut-in Pressure: 1133 PSI Final Hydro Pressure: 1618 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3291 ft. |
|
Initial Flow: Strong- bottom of bucket Gas to surface in 16 mintues. Too Small to measure. Initial Shut-In: Bled off blow- blow came back. Final Flow: Strong bottom of bucket in 2 minutes. Final Shut-In: Bled off blow- blow came back. |
|
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: 20 Samples: Gas Recovery: Comments: | |
|
Recovery 1330 of Total Fluid 1330 of Fluid in Drill Pipe 1330 of Clean Gassy Oil 34 of Gravity (API) | |
| View Pressures | No Recovery Gas data. |
| Test Number: 2 | Data Source: TRILOBITE |
|
Interval: 3472 to 3486
Formation tested: Penn Sd | Date, Time: 19-APR-00; 14:33:07 |
|
Initial Hydro Pressure: 1763 PSI
First Initial Flow Pressure: 312 PSI First Final Flow Pressure: 843 PSI Initial Shut-in Pressure: 1169 PSI Second Initial Flow Pressure: 923 PSI Second Final Flow Pressure: 1155 PSI Final Shut-in Pressure: 1175 PSI Final Hydro Pressure: 1735 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: in. Drill Pipe ID: 3.8 in. Drill Collar Length: ft. Drill Pipe Length: 3480 ft. |
|
Initial Flow: Strong-bottom of bucket in 45 seconds Initial Shut-In: Bled off blow-blow came back. Final Flow: Strong-bottom of bucket in 35 seconds Final Shut-In: Bled off blow-no blow back. |
|
|
Bottom Hole Temperature: 110 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2542 of Total Fluid 2542 of Fluid in Drill Pipe 1000 of Muddy water 1542 of Slightly muddy water 34000 of Salinity (PPM) | |
| View Pressures | No Recovery Gas data. |