|
API: 15-051-25031
Operator: HERTEL OIL CO Field: Engel Lease: Engel Well 1 |
Location: T14S R18W, Sec. 34, E2 SE
1500 North, 440 West, from SE corner Longitude: -99.3014533 Latitude: 38.7880911 County: Ellis Status: D&A |
Spud Date: 04/22/2000
Completion Date: 04/29/2000 Plugging Date: 04/29/2000 Total Depth: 3676 Form. at depth: ARBUCKLE Elevation: 2036 KB |
| Test Number: 1 | Data Source: TRILOBITE |
|
Interval: 3600 to 3636
Formation tested: Cong Sd | Date, Time: 04/28/2000; 04:01:57 |
|
Initial Hydro Pressure: 1869 PSI
First Initial Flow Pressure: 13 PSI First Final Flow Pressure: 15 PSI Initial Shut-in Pressure: 47 PSI Second Initial Flow Pressure: 15 PSI Second Final Flow Pressure: 18 PSI Final Shut-in Pressure: 34 PSI Final Hydro Pressure: 1829 PSI |
Tool Data Hole Size: 7.88 in. Drill Collar ID: 2.25 in. Drill Pipe ID: 3.8 in. Drill Collar Length: 30 ft. Drill Pipe Length: 3571 ft. |
|
Initial Flow: Weak steady surface blow. Final Flow: No blow. |
|
|
Bottom Hole Temperature: 109 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
|
Recovery 2 of Total Fluid 2 of Fluid in Drill Collars 2 of Drilling mud | |
| View Pressures | No Recovery Gas data. |