Drill Stem Tests Database
Specific Well--15-081-21301
API: 15-081-21301
Operator: JOHN O. FARMER, INC.
Field: Toni-Mike Northeast
Lease: Cooper Trust
Well 1-34
Location: T30S R31W, Sec. 34, NW SE
1980 North, 1980 West, from SE corner
Longitude: -100.6953928
Latitude: 37.3930369
County: Haskell
Status: OIL
Spud Date: 22-MAY-00
Completion Date: 26-JUN-00
Plugging Date:
Total Depth: 5605
Form. at depth: MISSISSIPPIAN
Elevation: 2840 KB
Test Number: 5 Data Source: TRILOBITE
Interval: 5435 to 5498
Formation tested: Chester
Date, Time: 02-JUN-00; 15:25:07
Initial Hydro Pressure: 2573 PSI
First Initial Flow Pressure: 55 PSI
First Final Flow Pressure: 63 PSI
Initial Shut-in Pressure: 1212 PSI
Second Initial Flow Pressure: 101 PSI
Second Final Flow Pressure: 137 PSI
Final Shut-in Pressure: 1700 PSI
Final Hydro Pressure: 2507 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 275 ft.
Drill Pipe Length: 5158 ft.
Initial Flow: Strong bottom of bucket in 2 minutes. Cracked 2"" Initial Shut-In: No blow back.
Final Flow: Strong immediately. Cracked 2"". No gas to surface. Gauged displaced air for flow rate. Stabilized at 3,710.
Final Shut-In: 2"" blow back. Gas to surface. Remarks: Est. 5 Ft. of pay. Gas burned.
Bottom Hole Temperature: 127 DEG F
Percent Porosity: 8
Samples: None
Gas Recovery:
Comments:
Recovery
310 of Total Fluid
275 of Fluid in Drill Collars
35 of Fluid in Drill Pipe
5123 of Gas in pipe.
70 of Slightly oil cut mud
120 of Heavy oil & gas cut mud
120 of Mud cut gassy oil
30 of Gravity (API)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.