Drill Stem Tests Database
Specific Well--15-119-21022
API: 15-119-21022
Operator: Raydon Exploration, Inc.
Field: Perth
Lease: Wynona
Well 2-7
Location: T35S R29W, Sec. 7, SW NE NW
802 South, 1564 East, from NW corner
Longitude: -100.5183685
Latitude: 37.0226931
County: Meade
Status: GAS-P&A
Spud Date: 27-APR-00
Completion Date: 15-JUN-00
Plugging Date: 27-JAN-17
Total Depth: 6377
Form. at depth: CHESTER
Elevation: 2434 KB
Test Number: 3 Data Source: TRILOBITE
Interval: 6305 to 6327
Formation tested: St. Louis
Date, Time: 11-MAY-00; 05:34:06
Initial Hydro Pressure: 3007 PSI
First Initial Flow Pressure: 181 PSI
First Final Flow Pressure: 322 PSI
Initial Shut-in Pressure: 1838 PSI
Second Initial Flow Pressure: 386 PSI
Second Final Flow Pressure: 588 PSI
Final Shut-in Pressure: 1781 PSI
Final Hydro Pressure: 2969 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 358 ft.
Drill Pipe Length: 5945 ft.
Initial Flow: Strong bottom of bucket in 45 seconds Cracked 2"". Decreased slightly. Initial Shut-In: Strong bottom of bucket blow back. Gas to surface in 5 minutes.
Final Flow: Weak 2"" built to strong bottom of bucket in 5 minutes. Gauged 7,880 CFPD
Final Shut-In: Strong bottom of bucket blow back.
Bottom Hole Temperature: 144 DEG F
Percent Porosity: 15
Samples: One
Gas Recovery:
Comments:
Recovery
1185 of Total Fluid
358 of Fluid in Drill Collars
827 of Fluid in Drill Pipe
5118 of Gas in pipe.
100 of Mud & water cut oil
185 of Oil & gas cut muddy water
900 of Gassy water
88000 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 1 Data Source: TRILOBITE
Interval: 5238 to 5301
Formation tested: Marmoton
Date, Time: 05-MAY-00; 18:15:27
Initial Hydro Pressure: 2612 PSI
First Initial Flow Pressure: 42 PSI
First Final Flow Pressure: 148 PSI
Initial Shut-in Pressure: 1716 PSI
Second Initial Flow Pressure: 169 PSI
Second Final Flow Pressure: 263 PSI
Final Shut-in Pressure: 1727 PSI
Final Hydro Pressure: 2408 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 299 ft.
Drill Pipe Length: 4922 ft.
Initial Flow: Fair blow built to strong blot. Bottom of bucket in 5 minutes. Initial Shut-In: No blow back.
Final Flow: Fair blow built to strong blow. Bottom of bucket in 13 minutes.
Final Shut-In: No blow back.
Bottom Hole Temperature: 122 DEG F
Percent Porosity: 15
Samples: None
Gas Recovery:
Comments:
Recovery
590 of Total Fluid
300 of Fluid in Drill Collars
290 of Fluid in Drill Pipe
1030 of Gas in pipe.
120 of Oil & watrer cut gassy mud
120 of Gassy wter cut mud
350 of Mud cut salt water
30000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 5810 to 5850
Formation tested: Morrow
Date, Time: 08-MAY-00; 10:52:06
Initial Hydro Pressure: 2803 PSI
First Initial Flow Pressure: 45 PSI
First Final Flow Pressure: 60 PSI
Initial Shut-in Pressure: 2028 PSI
Second Initial Flow Pressure: 60 PSI
Second Final Flow Pressure: 63 PSI
Final Shut-in Pressure: 2027 PSI
Final Hydro Pressure: 2765 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 358 ft.
Drill Pipe Length: 5448 ft.
Initial Flow: Strong bottom of bucket immediately. Gauged 113,000 CFPD Initial Shut-In: No blow back.
Final Flow: Gauged 148,500 CFPD in 10 minutes. Increased to 224,000 CFPD in 60 minutes.
Final Shut-In: No blow back. Remarks: Est. 20 Ft. of Pay. Gas burned.
Bottom Hole Temperature: 125 DEG F
Percent Porosity: 10
Samples: One
Gas Recovery:
Comments:
Recovery
20 of Total Fluid
20 of Fluid in Drill Collars
5786 of Gas in pipe.
20 of Mud
2800 of Salinity (PPM)
View Pressures View Recovery Gas
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.