API: 15-187-20931
Operator: McElvain Energy, Inc. Field: Nicholas Lease: Nickens Well 21-15 |
Location: T30S R39W, Sec. 21, S2 SW SE
330 North, 1980 West, from SE corner Longitude: -101.5869875 Latitude: 37.4184804 County: Stanton Status: D&A |
Spud Date: 30-APR-00
Completion Date: 11-MAY-00 Plugging Date: 12-MAY-00 Total Depth: 5770 Form. at depth: MORROW Elevation: 3209 KB |
Test Number: 1 | Data Source: TRILOBITE |
Interval: 5650 to 5670
Formation tested: Morrow | Date, Time: 10-MAY-00; 13:17:58 |
Initial Hydro Pressure: 2693 PSI
First Initial Flow Pressure: 22 PSI First Final Flow Pressure: 24 PSI Initial Shut-in Pressure: 190 PSI Second Initial Flow Pressure: 20 PSI Second Final Flow Pressure: 32 PSI Final Shut-in Pressure: 159 PSI Final Hydro Pressure: 2679 PSI |
Tool Data Hole Size: 7.78 in. Drill Collar ID: 2.23 in. Drill Pipe ID: 3.38 in. Drill Collar Length: 645 ft. Drill Pipe Length: 4997 ft. |
Initial Flow: Weak 1/2"" surface blow. Initial Shut-In: No blow back. Final Flow: Weak 1/4"" blow. Final Shut-In: No blow back. |
|
Bottom Hole Temperature: 140 DEG F
Percent Porosity: Samples: Gas Recovery: Comments: | |
Recovery 4 of Total Fluid 4 of Fluid in Drill Collars 4 of Mud | |
View Pressures | No Recovery Gas data. |
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display. | |