Drill Stem Tests Database
Specific Well--15-187-20931
API: 15-187-20931
Operator: McElvain Energy, Inc.
Field: Nicholas
Lease: Nickens
Well 21-15
Location: T30S R39W, Sec. 21, S2 SW SE
330 North, 1980 West, from SE corner
Longitude: -101.5869875
Latitude: 37.4184804
County: Stanton
Status: D&A
Spud Date: 30-APR-00
Completion Date: 11-MAY-00
Plugging Date: 12-MAY-00
Total Depth: 5770
Form. at depth: MORROW
Elevation: 3209 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 5650 to 5670
Formation tested: Morrow
Date, Time: 10-MAY-00; 13:17:58
Initial Hydro Pressure: 2693 PSI
First Initial Flow Pressure: 22 PSI
First Final Flow Pressure: 24 PSI
Initial Shut-in Pressure: 190 PSI
Second Initial Flow Pressure: 20 PSI
Second Final Flow Pressure: 32 PSI
Final Shut-in Pressure: 159 PSI
Final Hydro Pressure: 2679 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.23 in.
Drill Pipe ID: 3.38 in.
Drill Collar Length: 645 ft.
Drill Pipe Length: 4997 ft.
Initial Flow: Weak 1/2"" surface blow. Initial Shut-In: No blow back.
Final Flow: Weak 1/4"" blow.
Final Shut-In: No blow back.
Bottom Hole Temperature: 140 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
4 of Total Fluid
4 of Fluid in Drill Collars
4 of Mud
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.