Drill Stem Tests Database
Specific Well--15-007-22618
API: 15-007-22618
Operator: PICKRELL DRILLING CO., INC.
Field: Moffett West
Lease: Lee 'T'
Well 1
Location: T30S R15W, Sec. 9, SW SE
530 North, 2310 West, from SE corner
Longitude: -98.9653597
Latitude: 37.4431061
County: Barber
Status: D&A
Spud Date: 10-JUL-00
Completion Date: 19-JUL-00
Plugging Date: 19-JUL-00
Total Depth: 4724
Form. at depth: VIOLA
Elevation: 1954 KB
Test Number: 1 Data Source: TRILOBITE
Interval: 4089 to 4130
Formation tested: LKC
Date, Time: 15-JUL-00; 14:36:27
Initial Hydro Pressure: 1948 PSI
First Initial Flow Pressure: 18 PSI
First Final Flow Pressure: 143 PSI
Initial Shut-in Pressure: 1472 PSI
Second Initial Flow Pressure: 145 PSI
Second Final Flow Pressure: 297 PSI
Final Shut-in Pressure: 1436 PSI
Final Hydro Pressure: 1909 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 3839 ft.
Initial Flow: Weak building to a good blow 1/2"" to 9"" blow.
Final Flow: Weak building to a good blow 1/2"" to 9"" blow
Final Shut-In: No blow.
Bottom Hole Temperature: 117 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
505 of Total Fluid
240 of Fluid in Drill Collars
265 of Fluid in Drill Pipe
85 of Muddy Water
420 of Water
113000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.
 
Test Number: 2 Data Source: TRILOBITE
Interval: 4626 to 4650
Formation tested: Viola
Date, Time: 17-JUL-00; 15:52:46
Initial Hydro Pressure: 2261 PSI
First Initial Flow Pressure: 258 PSI
First Final Flow Pressure: 915 PSI
Initial Shut-in Pressure: 1387 PSI
Second Initial Flow Pressure: 928 PSI
Second Final Flow Pressure: 1354 PSI
Final Shut-in Pressure: 1401 PSI
Final Hydro Pressure: 2248 PSI
Tool Data
Hole Size: 7.78 in.
Drill Collar ID: 2.25 in.
Drill Pipe ID: 3.8 in.
Drill Collar Length: 240 ft.
Drill Pipe Length: 4395 ft.
Initial Flow: Strong blow in 1 minute. Initial Shut-In: Had 8 1/2"" blow.
Final Flow: Strong blow throughout.
Final Shut-In: No blow.
Bottom Hole Temperature: 122 DEG F
Percent Porosity:
Samples:
Gas Recovery:
Comments:
Recovery
2900 of Total Fluid
240 of Fluid in Drill Collars
2660 of Fluid in Drill Pipe
120 of Muddy water
2780 of Water
110000 of Salinity (PPM)
View Pressures No Recovery Gas data.
Download original data
ZIP file contains the orignal DST data supplied to the KGS by Trilobite Testing LLC . Four files are in each archive. The .flg file is an ascii file that has time and pressure at change points (open, shutin, etc.). The .csv is the original data extracted into a comma delimited file. The last two files (the .inf file and a file with a variable extension) are binary files that require Alpine DST software for display.